wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Day 59-Nov 21-worksheet-Diploma-Surveying introduction

Total questions: 15

Worksheet time: 13mins

Name
Class
Date
1.

In geodetic surveying, plumb lines are considered as —

a)

Parallel

b)

Continuous

c)

Radial

d)

Perpendicular

2.

The excess of spherical triangle angle sum over plane triangle is about one second for every —

a)

195.5 km²

b)

260 km²

c)

91 km²

d)

18.2 km

3.

Survey dealing with unearthing relics and antiquities is —

a)

Mine survey

b)

Geological survey

c)

Topographical survey

d)

Archeological survey

4.

A series of connected survey lines of known lengths and directions is called —

(a)  

5.

Which survey considers curvature of the Earth?

(a)  

6.

The headquarters of Survey of India is located at —

(a)  

7.

Assertion (A): Plane survey assumes plumb lines are parallel. Reason (R): Because Earth is treated as spherical over small areas. Choose the correct option —

a)

A and R true; R explains A

b)

A and R true; R doesn’t explain A

c)

A true; R false

d)

A false; R true

8.

The average radius of the Earth is about (a)   km.

9.

The fundamental principle of surveying is to work from ______ to ______.

(a)  

10.

A map represents the Earth’s surface on a (a)   scale.

11.

Survey used to determine different strata in Earth's crust is (a)   survey.

12.

Find the odd one out: Topographical survey, Cadastral survey, City survey, Astronomical survey

a)

Topographical survey

b)

Cadastral survey

c)

City survey

d)

Astronomical survey

13.

Arrange the steps in correct order for survey principle:

1. Fix new station 2. Take reference from existing control points 3. Perform linear/angular measurements

(a)  

14.

How many meters are in 1 fathom?

(a)  

15.

Convert Gunter’s chain to meter. 1 chain = 66 feet; 1 foot = 0.3048 m. How many meters are in 1 chain?

(a)