Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

ADNOC Gas Maintenance Workshop

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

How structured and consistent is your maintenance planning process across sites/assets?

a)

No formal planning process

b)

Defined but not fully followed

c)

Basic process but inconsistent

d)

Standardized and mostly consistent

e)

Fully standardized and optimized

2.

What is the biggest challenge preventing higher proactive maintenance vs reactive work?

a)

Frequent breakdowns and emergency work

b)

Limited data visibility for planning

c)

Lack of resources / manpower

d)

Poor planning or scheduling discipline

e)

Spare parts availability issues

3.

What are the main barriers to building accurate job plans?

a)

Incomplete scope definition / poor notification quality

b)

Limited historical work data or equipment documentation

c)

Inaccurate estimates of time, tools, or manpower

d)

Incomplete job packs (drawings, permits, safety steps)

e)

Poor coordination between planner & execution teams

4.

What causes planned jobs to be rescheduled or cancelled most frequently?

a)

Manpower shortage or skills availability

b)

Spare parts or material delays

c)

Permit & access issues / operational constraints

d)

Poor job readiness or incomplete planning

e)

Weather, logistics or site availability

5.

What most effects schedule compliance performance?

a)

Poor prioritization or job selection

b)

Excessive urgent/emergency workload

c)

Poor communication between planning & operations

d)

Inaccurate duration/manhour estimation

e)

Inadequate field supervision and tracking

6.

What is the major challenge in execution productivity (Wrench Time)?

a)

Waiting time for materials, parts, tools or equipment

b)

Long travel & access time to job location

c)

Delays in permits or isolation

d)

Lack of clear instructions / job method clarity

e)

Multiple interruptions or unplanned scope changes

7.

How reliable and complete is job documentation in the CMMS (task lists, BOM, history)?

a)

 Very poor / mostly missing

b)

Basic but inaccurate

c)

Fair but inconsistent

d)

Good quality, mostly reliable

e)

Excellent and continuously updated

8.

What is the main driver of backlog issues?

a)

Excessive reactive workload

b)

Inadequate resource planning / crew capacity

c)

Inefficient scheduling practices

d)

Lack of shutdown/turnaround integration

e)

Ineffective prioritization or governance

9.

What causes delays in completing planned jobs?

a)

Scope not fully understood before execution

b)

Lack of tools, consumables or spare parts

c)

Operational access/permitting issues

d)

Limited skilled workforce available

e)

Work package not ready or incorrect

10.

If one factor could significantly improve planning & execution, what would it be?

a)

 Better CMMS data accuracy & visibility

b)

Improved planning and scheduling process

c)

Stronger coordination between maintenance & operations

d)

Increased workforce capability and resources

e)

Improved inventory & spare parts management