WorksheetsCommunication Mock Exam 2 Level 2 (2365) Electrical Installation
Total questions: 22
Worksheet time: 20mins
Select the correct answer from the four options. If a customer has special learning difficulties which one of the following should you do?
Call your boss
Refer them to another company
Keep information short and relevant
Return later when someone else is there
Select the correct answer from the four options. Which one of the following would be employed by the main contractor?
Subcontractor
Architect
Building control officer
Clerk of works
Select the correct answer from the four options. When installing an appliance, which document would you reference for the installation instructions?
BS 7671:2018
The Electrical At Work Regulations
Manufacturers’ instructions
Works programme
Select the correct answer from the four options. Which of the following documents offers guidance but is not legally enforceable?
Manufacturers’ instructions
Building Regulations
Act of Parliament
Contract of employment
Select the correct answer from the four options. A building control officer (BCO) commonly works for:
the main contractor
the local authority
the architect
the client
Select the correct answer from the four options. The document that is handed to the customer, detailing the work to be done and a price is called:
an invoice
an estimate
statutory cancellation rights
a quotation
Select the correct answer from the four options. The document that an operative submits, detailing the number of hours worked is:
a time sheet
a specification
a delivery note
a quotation
Select the correct answer from the four options. One quality that would ensure the respect and cooperation of others on site is:
aggressiveness
submission
politeness
rudeness
Select the correct answer from the four options. The main purpose of the works programme is to:
state when payments are due
provide clear indication of when an activity should start and finish
assist the electrician in calculating the amount of materials required
assist the contractor in planning the number of personnel that may be required
Select the correct answer from the four options. What is the process where people in a meeting discuss items and come to an agreement?
Arbitration
Negotiation
Adjudication
Cavalcade
Select the correct answer from the four options. The document that requests payment is called:
quotation
invoice
bill of quantity
delivery note
Select the correct answer from the four options. Which of the following tradespeople would normally grout the bathroom?
Bricklayer
Electrician
Roofer
Tiler
Select the correct answer from the four options. A new employee in a company would normally be given which of the following documents?
Health and Safety at Work Act
Bill of quantities
Contract of employment
Quotation
Can you draw a 20Amp Radial Socket circuit (3 sockets) with one fused spur. More points for most detail included.

Select the correct answer from the four options. Which one of the following communication methods is considered as official and can help towards a good company image?
Letter
Fax
Verbal
Select the correct answer from the four options. Which one of the following jobs would a structural engineer carry out?
Position a building
Attach architrave
Design load-bearing beams
Plan the works schedule
Select the correct answer from the four options. What is the main function of the electrical services inspector?
Make sure that the correct colours have been used for cable insulation
Make sure that accessories have been installed to specification
Make sure that the installation complies with BS 7671:2018
Make sure that the voltage in the premises is sufficient
Select the correct answer from the four options. The route of main trunking within a property can be found in which document?
Job specification
Building services drawing
Building plan
Bill of quantities
Select the correct answer from the four options. Which one of the following organisations specialises in impartial advice concerning employment difficulties?
CITB
CSCS
UKAS
ACAS
Select the correct answer from the four options. Which document would outline the commissioning requirements for a piece of electrical equipment?
Building Regulations
Manufacturers’ instructions
British Standards
Appliance plan
Select the correct answer from the four options. If there was a dispute between an employee and an employer, who could be used in the discussions?
Trade Union
Employment control officer
Health and safety representative
Employee’s family
Can you draw an intermediate lighting circuit with 1 light. More points for more detail included.