wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

EW-1 Quality Quiz [22-11-2025]

Total questions: 15

Worksheet time: 3mins

Name
Class
Date
1.

What is Quality?

a)

Quality is Luxury.

b)

Quality is meeting Contract expectations every time.

c)

Quality happens by accident.

d)

All the above.

2.

What is the theme of World Quality Month November 2025.

a)

Quality for a Sustainable Future

b)

Quality: Thinks Differently

c)

Assure Constancy through quality innovation and performance

d)

Innovation in Quality Management

3.

How many SSPs are there in EW1 project?

a)

24

b)

18

c)

27

d)

19

4.

In a 2×25 kV system, the train actually receives how much voltage?

a)

50 kV

b)

25 kV

c)

2 kV × 25 times

d)

As much as the driver demands

5.

What does “NCR” stand for in quality management?

a)

Non-Certified Result

b)

Non-Compliance Review

c)

Non Conformance Report

d)

Normal Check Record

6.

How many samples are required for 28-day compressive strength testing for 49 m³ RCC concrete as per IS 456? (Note: 1 sample = 3 cubes)

a)

2

b)

4

c)

3

d)

1

7.

What is the maximum height of the mast in this project (MAHSR EW-1)?

a)

14.25

b)

15.25

c)

13.5

d)

14.5

8.

In which date contract agreement signed between SLT and NHSRCL?

a)

01st Feb 2024

b)

15th Jan 2024

c)

08th Feb 2024

d)

22nd Feb 2024

9.

The latest published version of ISO 9001 (QMS) is ISO 9001:____?

a)

2011

b)

2008

c)

2025

d)

2015

10.

TSS-08 located at which chainage

a)

325.750

b)

350.25

c)

327.750

d)

426.661

e)

229.300

11.

Which grade of natural sand should not be used in RCC (Reinforced Cement Concrete) as per IS 383?

a)

ZONE 3

b)

ZONE 1

c)

ZONE 4

d)

ZONE 2

12.

What is JE Stands for in our Project?

a)

Junior Engineer

b)

Japan Electric Engineer

c)


Japan High Speed Rail Electric Engineering.

d)

Japan International Consultants Engineering.

e)

Japanese Engineering

13.

Full form of MRM with respect to Quality Management System (QMS)?

a)

Material resource manager

b)

Manpower resource management

c)

Man reporting manager

d)

Management Review Meeting

14.

Which is a component of LV panels?

a)

Contactors

b)

Circuit breakers

c)

MCB/MCCB

d)

All of the above

15.

What is NOT the mandatory requirement in raising RFI?

a)

Material Approval

b)

Chainage

c)

Method Statement

d)

Structure ID