مشروع 1

Total questions: 150

Worksheet time: 1hrs 15mins

Name
Class
Date
1.

What is the significance of Project Management Professional (PMP) certification?

a)

It is mandatory for all project managers

b)

It provides recognition and standardization in the field of project management

c)

It guarantees project success

d)

It eliminates the need for experience in project management

2.

What is a program in project management?

a)

A single task within a project

b)

A group of related projects managed in a coordinated way

c)

An ongoing business process

d)

A temporary event with a single outcome

3.

A project is an ongoing process with no defined end

a)

True

b)

False

4.

Formal project management helps improve worker morale

a)

True

b)

False

5.

What is the role of project stakeholders?

a)

They only provide financial support for the project

b)

They are involved in or affected by project activities

c)

They only manage procurement processes

d)

They work exclusively on risk management

6.

How does project management contribute to enterprise success?

a)

By increasing project costs

b)

By ensuring that all projects are completed on time and within budget

c)

By avoiding stakeholder involvement

d)

By eliminating the need for risk management

7.

Portfolio management is focused on managing a single project

a)

True

b)

False

8.

The number of people earning a PMP certification has been decreasing over time

a)

True

b)

False

9.

The triple constraint in project management includes scope, time, and cost

a)

True

b)

False

10.

What is the definition of a project according to the PMBOK® Guide?

a)

A permanent endeavor undertaken to create unique product

b)

A temporary endeavor untaken to create a unique product, service, or result

c)

An ongoing process to maintain business operations

d)

A set of random tasks with no specific goal

11.

A project can be large or small and take a short or long time to complete

a)

True

b)

False

12.

The main goal of project management is to ensure stakeholder dissatisfaction

a)

True

b)

False

13.

Which of the following is NOT a benefit of formal project management?

a)

Improved customer relations

b)

Higher quality and reliability

c)

Increased project complexity

d)

Better internal coordination

14.

A project sponsor is responsible for providing direction and funding for the project

a)

True

b)

False

15.

Risk management is one of the ten knowledge areas in project management

a)

True

b)

False

16.

What is the main role of a project manager?

a)

To provide funding for the project

b)

To work with stakeholders and ensure project goals are met

c)

To perform all technical tasks within the project

d)

To eliminate all project risks

17.

Which of the following is Not an attribute of a project?

a)

It has a unique purpose

b)

It is temporary

c)

It has no uncertainty

d)

It requires resources

18.

What happens in the final phase of a project?

a)

Project completion and approval from the sponsor

b)

Maximum resource utilization

c)

Uncertainty and risk are highest

d)

The project scope is defined

19.

What is one of the most important skills for a project manager?

a)

People skills and leadership

b)

Technical expertise only

c)

Financial management

d)

Customer service

20.

Which global trend is forcing organizations to rethink project management practices?

a)

The need for talent development in project management

b)

The elimination of project portfolio management

c)

A shift away from agile project management approaches

d)

The declining importance of risk management

21.

What are the three primary constraints in project management?

a)

Cost, scope, and quality

b)

Scope, time, and cost

c)

Schedule, budget, and procurement

d)

Integration, scope, and stakeholders

22.

What percentage of IT projects were successful in meeting scope, time, and cost goals according to the 1995 CHAOS study?

a)

16.2%

b)

31%

c)

50%

d)

Reply

e)

2.5%

23.

What is the main purpose of a process in project management?

a)

Create risk mitigation strategies

b)

Achieve a specific result through a series of actions

c)

Budget project costs

d)

Define team communication

24.

What is a project champion?

a)

A senior manager who supports and promotes the project

b)

A team member responsible for documentation

c)

A third-party consultant hired to assess project progress

d)

A financial stakeholder who only provides funding

25.

Which document outlines key stakeholders and their contact information?

a)

Project charter

b)

Stakeholders register

c)

Team contract

d)

Project schedule

26.

Which item is Not typically included in the planning outputs?

a)

WBS

b)

Milestone report

c)

Scope statement

d)

Project schedule

27.

The WBS is part of the planning process group

a)

True

b)

False

28.

Milestone reports are used during project execution

a)

True

b)

False

29.

What new certification did PMI introduce in 2011 for Agile practitioners?

a)

PMP

b)

CAMP

c)

ACP (Agile Certified Practitioner)

d)

CSM

30.

What are the five project management process groups?

a)

Initiation, Execution, Budgeting, Controlling, Archiving

b)

Initiation, Planning, Execution, Monitoring and Controlling

c)

Planning, Testing, Evaluating, Reporting, Concluding

d)

Starting, Running, Testing, Reporting, Ending

31.

Stakeholder engagement is NOT important for project success

a)

True

b)

False

32.

The role of a project manager includes planning, scheduling, and coordinating teams

a)

True

b)

False

33.

What are the top three reasons why federal technology projects succeed?

a)

High risk-taking, fast execution, and frequent changes

b)

Adequate funding, staff expertise, and stakeholder engagement

c)

Low costs, limited documentation, and minimal oversight

d)

Quick project approvals, high-speed execution, and limited testing

34.

What is one of the main reasons for improved project success rates?

a)

The cost of projects has significantly decreased

b)

The increase in project failure has led to better documentation

c)

More companies are avoiding project management practices

d)

Fewer organizations are investing in project management tools

35.

According to the Standish Group's CHAOS studies, what was the IT project success rate in 2010?

a)

16%

b)

37%

c)

50%

d)

21%

36.

Project portfolio management helps organizations manage projects strategically

a)

True

b)

False

37.

Gantt charts and network diagrams are examples of project management tools

a)

True

b)

False

38.

Which of the following is considered a best practice in project management?

a)

Ignoring non-essential stakeholders

b)

Ensuring projects align with business strategy

c)

Avoiding project portfolio management

d)

Managing projects independently without strategic oversight

39.

Which of the following is NOT a key factor for project success?

a)

User involvement

b)

Frequent changes in project scope

c)

Executive support

d)

Clear business objectives

40.

What is the primary role of a Project Management Office (PMO)?

a)

Performing technical work on all project

b)

Coordinating project management efforts across an organization

c)

Reducing the need for project managers

d)

Eliminating project risks entirely

41.

A project manager often takes on the roles of both leader and manager

a)

True

b)

False

42.

Which of the following best describes project management ethics?

a)

A set of financial rules governing projects

b)

Principles that guide decision-making based on right and wrong

c)

A list of laws enforced by PMI

d)

A method for controlling project costs

43.

Leadership skills are only important in large projects

a)

True

b)

False

44.

Which of the following is considered the first project to use modern project management techniques?

a)

The Great Wall of China

b)

The Egyptian pyramids

c)

The Manhattan Project

d)

The Apollo moon landing

45.

What are "super tools" in project management?

a)

Tools with high usage and high potential for success improvement

b)

Advanced technologies used only in large-scale projects

c)

Tools that replace human decision-making

d)

Basic tools with limited impact on project performance

46.

The Certified Associate in Project Management (CAPM) is designed for beginners in project management

a)

True

b)

False

47.

The Project Management Institute (PMI) was founded in 1999

a)

True

b)

False

48.

The Manhattan Project is considered the first project to use modern project management

a)

True

b)

False

49.

The success rate of IT projects improved from 16% in 1994 to 37% in 2010

a)

True

b)

False

50.

Ethical dilemmas are common in project management

a)

True

b)

False

51.

What is the function of the Project Management Institute (PMI)?

a)

Selling project management software

b)

Promoting project management as a profession and offering certifications

c)

Eliminating the need for project management professionals

d)

Controlling all global project management activities

52.

Which of the following is the most important skill for managing large projects?

a)

Leadership

b)

Listening skills

c)

Self confidence

d)

Risk management

53.

In a 2011 survey, which skill was ranked second in the list of 'hottest IT skills'?

a)

Networking

b)

Project management

c)

Data center management

d)

Web 2.0

e)

User involvement

54.

What is the main difference between a leader and a manager?

a)

A leader focuses on day-to day tasks, while a manager sets long-term goals

b)

A leader focuses on long-term goals, while a manager handles daily Operations

c)

A leader avoids responsibility, while a manager takes full control

d)

A manager is always more important than a leader

55.

What is the Project Portfolio Management (PPM) responsible for?

a)

Grouping and managing projects as a portfolio to align with strategic goals

b)

Overseeing a single project from start to finish

c)

Ensuring that only large-scale projects are executed

d)

Replacing the need for individual project managers

56.

What is the purpose of a Work Breakdown Structure (WBS)?

a)

To break a project into smaller, manageable parts

b)

To define the project scope and deliverables

c)

To estimate project costs

d)

To schedule project packets

57.

What is the primary certification offered by PMI for experienced project managers?

a)

Certified Agile Practitioner (CAP)

b)

Project Management Professional (PMP)

c)

Six Sigma Green Belt

d)

Microsoft Project Expert

58.

What type of project management software is best suited for small single projects?

a)

Low-end tools

b)

Midrange tools

c)

High-end tools

d)

Enterprise project management software

59.

Which of the following is a key characteristic of an organization with a strong project culture?

a)

High risk tolerance

b)

Strong reward systems

c)

Open communication and stakeholder involvement

d)

All of the above

60.

What was one major reason for the failure of the baggage handling system at Denver International Airport (DIA)?

a)

Lack of funding

b)

Failure to recognize project complexity

c)

Too much stakeholders involvement

d)

Overuse of project management tools

61.

What are the three components of the systems approach to project management?

a)

Systems management, product testing, project planning

b)

Systems philosophy, systems analysis, systems management

c)

Organizational structure, project budget, and execution

d)

Strategic planning, scheduling, and risk assessment

62.

What is organizational culture?

a)

A project's scope, time, and cost

b)

A set shared assumptions values, and behaviors within an organization

c)

The formal organizational structure of a company

d)

The physical workspace environment

63.

What are the three types of organizational structures?

a)

Strategic, Operational, Functional

b)

IT, Business, Administration

c)

Functional, Project, Matrix

d)

Planning, Execution, Monitoring

64.

What is the systems view of project management?

a)

Focusing only on the technical aspects of the project

b)

Taking a holistic approach to managing projects within an organization

c)

Ignoring the business and technological aspects of the project

d)

Managing projects in isolation from the organization

65.

What is a common reason for IT project failure as discussed in the lecture?

a)

Strong organizational structure

b)

Adequate risk management

c)

Poor leadership stakeholders management

d)

Well-defined project objectives

66.

What is the project life cycle?

a)

A collection of phases that define project work, deliverables, and Approvals

b)

A method used to manage IT governance

c)

A financial framework for project funding

d)

A process limited of IT projects only

67.

In a matrix organizational structure, employees typically report to:

a)

Only one boss

b)

Two or more bosses

c)

The CEO directly

d)

No one, as they are self-managed

68.

Why is stakeholders management important in project management?

a)

Stakeholders influence project success and must engaged effectively

b)

Stakeholders are only involved in the planning phase

c)

Stakeholders have no direct impact on project execution

d)

Stakeholders involvement is optional

69.

In a predictive life cycle model, project scope?

a)

Is well-defined from the beginning

b)

Constantly changes throughout the project

c)

Is never clearly articulated

d)

Does not impact project cost

70.

In early phases of a project, which factor is highest?

a)

Project completion rate

b)

Resource availability

c)

Uncertainty and risk

d)

Customer satisfaction

71.

Why is top management commitment important for project success?

a)

It ensures that project managers handle everything alone

b)

It provides resources, approval, and organizational support

c)

It eliminates the need for risk management

d)

It makes IT governance unnecessary

72.

What is the Systems Development Life Cycle (SDLC)?

a)

A framework describing the phases of developing and maintaining IT Systems

b)

A methodology for tracking financial spending in projects

c)

A scheduling technique for short-term projects

d)

A training program for software developers

73.

What is the primary goal of management reviews (phase exits or kill points)?

a)

To create new project deliverables

b)

To assess project progress and alignment with business goals

c)

To approve project funding

d)

To hire new team members

74.

What is Scrum in Agile methodology?

a)

A budgeting method

b)

A leading framework for managing complex projects

c)

A quality assurance technique

d)

A tool for Gantt chart creation

75.

What is a daily Scrum?

a)

Weekly stakeholder meeting

b)

End-of-sprint review

c)

Daily team meeting to discuss progress

d)

Retrospective planning session

76.

What is a major disadvantage of virtual teams?

a)

Increased communication issues

b)

Access to global expertise

c)

Lower office space requirements

d)

Enhanced informal networking

77.

Which of the following is an advantage of virtual teams?

a)

Reduced collaboration

b)

Increased office infrastructure costs

c)

24/7 workforce availability

d)

Less need for communication tools

78.

What is the goal of a sprint in Scrum?

a)

Evaluate stakeholder satisfaction

b)

Produce a potentially shippable product increment

c)

Perform testing only

d)

Finalize documentation

79.

What is Agile project management based on?

a)

Comprehensive documentation

b)

Iterative and incremental development

c)

Waterfall approach

d)

Fixed contracts and planning

80.

According to Agile principles, how should teams respond to change?

a)

Follow the original plan

b)

Avoid client feedback

c)

Adapt and evolve solutions through collaboration

d)

Submit formal change requests

81.

What is outsourcing in IT project management?

a)

Hiring in-house staff for all technical tasks

b)

Acquiring goods or services from an external source

c)

Merging IT and business departments

d)

Selling organizational data

82.

In the case study of JWD Consulting, What was the purpose of the intranet site project?

a)

To improve payroll processing

b)

To deliver customer support tools

c)

To support internal project communication and documentation

d)

To build a public-facing website

83.

Which knowledge area includes activities in all process groups?

a)

Project Scope Management

b)

Project Integration Management

c)

Project Procurement Management

d)

Project Time Management

84.

What is the role of pre-initiation activities in project management?

a)

Report final deliverables

b)

Set expectations and define scope, time, and cost constraints

c)

Approve budgets

d)

Hire software developers

85.

What framework provides standardized guidelines for mapping process groups and knowledge areas?

a)

ISO 9001

b)

PMBOK® Guide

c)

RUP

d)

SCRUM

86.

In the context of project management, what does a methodology define?

a)

How things should be done

b)

What things should be done

c)

Who should lead the project

d)

When to end project

87.

What is one of the main issues organizations face in adopting Agile methodologies?

a)

Too much formality

b)

Cultural resistance and lack of coaching

c)

Excessive planning tools

d)

Lack of interest from clients

88.

According to the presentation, what phase of a movie production would editing correspond to in project management?

a)

Planning

b)

Execution

c)

Monitoring and Controlling

d)

Initiating

89.

Which of the following consumes the most time and resources in a project?

a)

Planning

b)

Initiating

c)

Monitoring

d)

Execution

90.

What is the purpose of a project kick-off meeting?

a)

To finalize budget

b)

To deliver final report

c)

To introduce stakeholders and review project goals

d)

To evaluate risks

91.

What was the financial result of the Quartier international de Montreal project?

a)

$770 million in related construction

b)

$300 million in net profit

c)

$1 billion in taxes

d)

No measurable impact

92.

What process involves tracking project performance and applying corrective action?

a)

Initiation

b)

Execution

c)

Monitoring and Controlling

d)

Closing

93.

What is the primary goal of project initiation?

a)

Start project execution

b)

Select the project team

c)

Formally start the project

d)

Deliver project results

94.

Which tool is helpful in tracking progress during execution?

a)

Gantt Chart

b)

Milestone Report

c)

Scope Statement

d)

Stakeholder Register

95.

Who typically signs the project charter?

a)

Project team

b)

Key stakeholders

c)

Client representative

d)

IT department

96.

What is a key output of the closing phase?

a)

Stakeholder register

b)

Scope statement

c)

Lessons-learned report

d)

WBS

97.

A Scrum team typically includes:

a)

5 to 9 cross-functional members

b)

3 to 5 members

c)

10 to 15 members

d)

Only developers

98.

The Sprint Planning meeting is primarily for:

a)

Selecting work for the next sprint

b)

Reviewing past sprint issues

c)

Assigning roles

d)

Tracking costs

99.

What differentiates Agile execution from PMBOK execution?

a)

Iterative releases and daily meetings

b)

Team size

c)

Budgeting techniques

d)

Documentation

100.

In Scrum, which meeting occurs daily?

a)

Daily Scrum

b)

Sprint Review

c)

Sprint Planning

d)

Retrospective

101.

What is the primary role of the Product Owner in Scrum?

a)

Prioritize work and manage the product backlog

b)

Facilitate daily meetings

c)

Write code for the sprint

d)

Monitor team attendance

102.

What is the purpose of the Sprint Retrospective?

a)

To reflect on team performance and improve

b)

To review customer feedback

c)

To plan for the next sprint

d)

To demonstrate the finished product

103.

What tool replaces the traditional tracking Gantt chart in Scrum?

a)

Burndown chart

b)

Risk register

c)

Sprint backlog

d)

Work breakdown structure

104.

Which Scrum artifact shows work remaining in a sprint?

a)

Burndown chart

b)

Sprint backlog

c)

Product backlog

d)

Gantt chart

105.

What is the unique benefit of Agile in project closure?

a)

Sprint retrospective for ongoing improvement

b)

Traditional audit reports

c)

Shorter duration of closing

d)

Release of resources

106.

In Scrum, what is the term of a completed, usable part of the software?

a)

Shippable product increment

b)

Release plan

c)

Technical story

d)

Daily deliverable

107.

Which process group normally requires the most resources and time?

a)

Closing

b)

Planning

c)

Initiating

d)

Executing

108.

Processes include coordinating people and other resources to carry out project plans and create the products, services, or results of the project or phase.

a)

Initiating

b)

Planning

c)

Monitoring and Controlling

d)

Executing

109.

Which of the following outputs is often completed before initiating a project?

a)

Business case

b)

Stakeholder register

c)

Project charter

d)

Kick-off meeting

110.

Involves measuring progress toward project objectives and taking corrective actions.

a)

Monitoring and Controlling

b)

Initiating

c)

Planning

d)

Executing

111.

Which of the following is not a typical reason that project teams would use a predictive approach versus an agile approach to managing a project?

a)

The project has unclear up-front requirements

b)

The project team is inexperienced and dispersed

c)

Large risks are involved

d)

The completion date is fairly rigid

112.

A work breakdown structure, project schedule, and cost estimates are outputs of the __ process.

a)

executing

b)

monitoring and controlling

c)

planning

d)

initiating

113.

Many people use ___ to have standard format for preparing various project management documents.

a)

templates

b)

methodologies

c)

project management software

d)

standards

114.

Initiating involves developing a project charter, which is part of the project ___ management knowledge area.

a)

Integration

b)

Scope

c)

communication

d)

risk

115.

Which of the following is NOT considered a project management tool?

a)

Gantt Charts

b)

Critical Path Analysis

c)

Budget Forecasting

d)

Word Processing Software

116.

What is a key reason for the increase in successful IT projects, according to the Standish Group's CHAOS studies?

a)

Increased complexity in project goals

b)

More skilled project managers and better tools

c)

Reduced involvement of stakeholders

d)

Fewer regulations on project execution

117.

Which of the following is a "Super Tool" that has high use and high potential for improving project success?

a)

Change Requests

b)

Risk Management Plans

c)

Lessons-learned reports

d)

Network Diagrams

118.

Which of the following statements best describes a "Best Practice" in project management?

a)

An industry-recognized way to achieve project goals effectively

b)

A guideline that all organizations must legally follow

c)

A theoretical model with no real-world application

d)

A technique used only in software development

119.

Which of the following is NOT one of the ten most important skills for project managers?

a)

Leadership

b)

Listening

c)

Conflict resolution

d)

Advanced programming skills

120.

What is the primary function of project portfolio management?

a)

Managing individual project schedules

b)

Grouping and managing projects strategically for the enterprise's success

c)

Supervising day-to-day tasks of a single project

d)

Developing financial budget for a project

121.

Which of the following tools are most likely to be used in project time management?

a)

Payback analysis

b)

Impact matrices

c)

Gantt charts

d)

Fishbone diagrams

122.

A Gantt chart is a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a ___ format.

a)

Calendar

b)

line graph

c)

bar graph

d)

pie chart

123.

Steve, an engineer in a construction company, is at present working on a home construction project. The home is being built for the Robinson family, the owners of the home. Steve is working with his project team and support staff to ensure the project is completed on time. In such a scenario, the project sponsor is __.

a)

Steve

b)

The support staff

c)

The project team

d)

The Robinson family

124.

Which of the following types of tools is usually recommended for small projects and single users?

a)

Low-end

b)

Midrange

c)

High-end

d)

Upper range

125.

Which of the following best defines the role of leaders?

a)

They focus on short-term objectives

b)

They work on achieving primarily tactical goals

c)

They work solely toward day-to-day details of meeting specific tasks

d)

They inspire people to reach goals

126.

An important tool for project scope management is __.

a)

fast tracking

b)

crashing

c)

a Gantt chart

d)

a work breakdown structure

127.

Which of the following is true of low-end tools of project management software?

a)

They are designed for especially large projects with multiple users

b)

Their main advantage is that they have unlimited functionality

c)

They provide basic project management features

d)

They are referred to as an enterprise project management software

128.

Which of the following project management knowledge areas is an overarching function that affects and is affected by the different knowledge areas?

a)

Project cost management

b)

Project stakeholder management

c)

Project integration management

d)

Project communication management

129.

The role of a __ is to provide direction and funding for a project.

a)

project sponsor

b)

project manager

c)

support staff member

d)

project team

130.

Joe is a project manager in an IT company and has over the years gained substantial knowledge in his area of work. However, while managing his team, he often loses his temper. In addition, he fails to be an active listener when his team members approach him with work-related challenges. In which of the following areas does Joe need to develop his skills?

a)

Application area knowledge

b)

Project environment knowledge

c)

Standards and regulations

d)

Human relations skills

131.

Project procurement management mainly involves:

a)

making effective use of the people involved with the project

b)

buying goods and services for a project from outside the performing organization

c)

generating, collecting, disseminating, and storing project information

d)

identifying and analyzing stakeholder needs while managing and controlling their engagement

132.

In which of the following areas of management is payback analysis most likely to be used?

a)

Human resource

b)

Communication

c)

Cost

d)

Quality

133.

Which of the following provides certification as a Project Management Professional?

a)

PMS

b)

PMC

c)

PMI

d)

PMP

134.

Team building exercises and motivation techniques are tools used in __ management?

a)

procurement

b)

scope

c)

human resource

d)

cost

135.

A __ is a tool used in risk management.

a)

work breakdown structure

b)

project organizational chart

c)

critical path analysis

d)

probability matrix

136.

Galaxy, a construction company, buys a particular brand of tiles manufactured by Tiles and Floors, an eco-friendly tile manufacturing company. However, Tiles and Floors has declared bankruptcy and closed down. At present, Galaxy is facing a crisis because there are no other manufactures in the market that supplies eco-friendly tiles. Which of the following constrains is Galaxy currently facing?

a)

Resources

b)

Time

c)

Scope

d)

Cost

137.

Which of the following is a difference between projects and operations?

a)

Projects are undertaken to sustain an organization's business whereas operations are not

b)

Operations are undertaken to create unique products, services, or result whereas projects are not

c)

Projects are temporary endeavors whereas an organization's operations are ongoing in nature

d)

Operations have well-defined objectives whereas projects do not need to have a unique purpose

138.

Which of the following is true of program managers?

a)

They report to project managers who represent the next level in the hierarchy

b)

They recognize that managing a program is simpler than managing a project

c)

They provide leadership and direction for project managers heading the projects within a program

d)

They are responsible solely for the delivery of project results

139.

Enterprise project management softwares are also known as __ tools of project management software

a)

baseline

b)

midrange

c)

low-end

d)

high-end

140.

Which of the following statements is true of project management?

a)

It is a simple discipline with a limited scope

b)

It has specific tool which work universally across all kinds of projects

c)

It does not guarantee successes for all projects

d)

Its framework consists solely of project management knowledge areas

141.

A critical path:

a)

is the shortest path through a network diagram

b)

represents schedule information in calendar form

c)

determines the earliest completion date of a project

d)

is a quality management tool to ensure a project meets the minimum quality standards

142.

Which of the following project management knowledge areas primarily involve generating, collecting, disseminating, and storing project information?

a)

Project cost management

b)

Project procurement management

c)

Project time management

d)

Project communications management

143.

Which of the following tools can best help in efficient communication management?

a)

Kick-off meetings

b)

Impact matrices

c)

Request for quotes

d)

Fast tracking

144.

Fast tracking is an example of a tool used in __ management

a)

Time

b)

Quality

c)

Communication

d)

Risk

145.

Project __ management ensures that the project will satisfy the started or implied needs for which it was undertaken

a)

cost

b)

time

c)

risk

d)

quality

146.

Which of the following questions reflect the strategic goals of project portfolio management?

a)

Are we carrying out projects well?

b)

Are projects on time and on budget?

c)

Are we investing in the right areas?

d)

Do stakeholders know what they should be doing?

147.

Which of the following refers to a set of principles that guides decision making based on personal values of what is considered right and wrong?

a)

Ethics

b)

Civics

c)

Laws

d)

Politics

148.

Which of the following is true of projects?

a)

They have indefinite beginning and end

b)

They have unique purpose

c)

They are developed using regressive elaboration

d)

They do not have a unique purpose

149.

Which of the following is a difference between project management and portfolio management?

a)

Project management involves making wise investment decisions whereas portfolio management does not

b)

Portfolio management is an easy task whereas project management is more difficult task

c)

Portfolio management asks questions like, "Are we carrying out projects efficiently?" whereas project management asks questions such as "Are we investing in the right areas?"

d)

Project management addresses specific, short-term goals whereas portfolio management focuses on long-term goals

150.

A __ is an organizational group responsible for coordinating the project management function throughout an organization

a)

Project Management Office

b)

Project Management Professional

c)

Project Management Center

d)

Portfolio Group