MCQ 2: IBS & modular construction

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

Which of the following is considered a 3D modular unit?

a)

Precast wall panel

b)

Bathroom pod

c)

Steel beam

d)

Timber slab

2.

Why is modular construction considered highly efficient?

a)

Because modules are built only on site

b)

Because most of the work is done in the factory

c)

Because it requires more labour

d)

Because it reduces prefabrication

3.

Which of the following is a disadvantage of IBS?

a)

Requires some on-site assembly

b)

Reduces construction time

c)

Ensures consistent quality

d)

Minimises waste

4.

In modular construction, what is usually done at the site?

a)

Building modules from scratch

b)

Only lifting, placing, and connecting modules

c)

Manufacturing walls and floors

d)

Installing all finishes manually

5.

Which is true about quality in modular construction?

a)

Quality is inconsistent because modules are built on site

b)

Quality is high due to factory-controlled conditions

c)

Quality depends entirely on-site labour

d)

Quality cannot be monitored

6.

What limits modular construction from being fully flexible in design?

a)

Labour availability

b)

Module size, transport, and factory standards

c)

Site preparation time

d)

Type of materials

7.

Which of the following reduces construction waste the most?

a)

Conventional on-site construction

b)

Modular construction

c)

Low-prefabrication IBS

d)

Manual brickwork

8.

Why is modular construction suitable for fast-track projects?

a)

Modules are built on site slowly

b)

Factory production and on-site works can occur simultaneously

c)

It requires no planning

d)

It needs more on-site labour than IBS

9.

Which IBS component is most suitable for complex, curved architectural designs?

a)

Precast wall panels

b)

Standard 3D modules

c)

Bathroom pods

d)

Volumetric hotel rooms

10.

Which of the following statements is true?

a)

IBS always uses 3D volumetric modules

b)

Modular construction requires more on-site labour than IBS

c)

IBS can include both 2D and 3D prefabricated components

d)

Modular construction allows unlimited architectural freedom