Civil war-Day 49-PWD-Construction management

Total questions: 10

Worksheet time: 10mins

Name
Class
Date
1.
Affordable delay in a task chain is known as
a)
Event
b)
duration
c)
Float
d)
Constraint
2.
In PERT analysis, the time estimates of activities and probability of their occurrence follow
a)
Normal distribution curve
b)
Poisson's distribution curve
c)
Rayleigh distribution curve
d)
Beta distribution curve
3.
The time an activity completion can be delayed without affecting the early start of the next activities is called :
a)
Total float
b)
Free float
c)
Interfering float
d)
Successive float
4.
Which one of the following represents an event ?
a)
Fixing of door
b)
Concrete cured
c)
Selecting sites
d)
Plastering of walls
5.
The amount of time it takes to receive materials from a supplier after the initial order has been placed is known as
a)
replenishment time
b)
lead time
c)
cycle time
d)
idle time
6.
In Critical Path Method (CPM) what does an arrow represent ?
a)
Critical path
b)
Event
c)
Activity
d)
Float
7.
The art of directing and coordinating human and material resources throughout a project is
a)
Contract
b)
Project management
c)
Consultancy
d)
Supervision
8.
The difference between the latest allowable time and the earliest expected time is :
a)
Maximum float
b)
Total float
c)
Slack time
d)
Free float
9.
Total indirect cost of a project includes
a)
Overheads + Outage Loss + Labour Charge
b)
Overheads + Outage Loss
c)
Outage Loss + Managerial Cost
d)
Stationary Cost + Office Cost
10.
The technique for establishing and maintaining priorities among various jobs of a project is known as
a)
Event flow scheduling technique
b)
Critical ratio scheduling
c)
Slotting technique for scheduling
d)
Short interval scheduling