Construction Health & Safety Quiz

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

Before starting work on site, what document is most important to review – like checking Santa’s list before delivery?

a)

Site welfare rota

b)

Risk assessment and method statement (RAMS)

c)

Tool hire agreement

2.

Why must PPE always be worn on site, even in cold Christmas weather?

a)

It looks professional

b)

It protects workers from hazards

c)

It replaces the need for training

3.

Which item of PPE is most important when there is a risk of falling objects, such as decorations being installed overhead?

a)

Safety boots

b)

High-visibility vest

c)

Safety helmet

4.

Slips and trips are more common in winter. What is the best way to reduce this risk on site?

a)

Ignore icy areas

b)

Good housekeeping and gritting walkways

c)

Wearing thicker gloves

5.

What should you do if you discover a hazard on site, like loose cables under festive lights?

a)

Work around it

b)

Report it immediately

c)

Wait until the end of the day

6.

Why is manual handling training important, especially when lifting heavy deliveries before Christmas?

a)

To improve speed

b)

To reduce the risk of injury

c)

To avoid using machinery

7.

Which action best reduces the risk of injury when lifting heavy objects?

a)

Bending from the waist

b)

Twisting while lifting

c)

Using correct lifting techniques or mechanical aids

8.

Working at height is one of the biggest risks in construction. What is the safest option?

a)

Use ladders wherever possible

b)

Avoid working at height if possible and use suitable access equipment

c)

Work quickly to reduce exposure

9.

Why must tools and equipment be checked regularly, especially before winter use?

a)

To make them look new

b)

To ensure they are safe and fit for purpose

c)

To reduce noise

10.

What is the main purpose of site inductions, like a Christmas briefing before festivities begin?

a)

To introduce colleagues

b)

To explain site rules, hazards, and emergency procedures

c)

To discuss pay rates

11.

Why is fire safety especially important during winter and Christmas periods?

a)

Buildings are usually unoccupied

b)

Temporary heaters and electrical decorations may increase fire risk

c)

Fire regulations are relaxed

12.

What should you do if a fire alarm sounds on site?

a)

Finish your task first

b)

Ignore it if you smell nothing

c)

Stop work immediately and follow evacuation procedures

13.

Why is good lighting important on site during darker winter days?

a)

To improve decoration quality

b)

To reduce accidents and improve visibility

c)

To save electricity

14.

Which of the following is a legal duty under UK health and safety law?

a)

Wearing festive clothing

b)

Taking reasonable care of your own and others’ safety

c)

Working overtime

15.

Why should access routes and emergency exits be kept clear at all times, even with Christmas decorations around?

a)

For appearance

b)

To allow safe evacuation in an emergency

c)

To store materials

16.

What is the correct response if you feel unwell or fatigued on site, especially during cold weather?

a)

Carry on working

b)

Inform your supervisor and take appropriate action

c)

Ignore it

17.

Why is alcohol and drug use strictly prohibited on construction sites, including during festive periods?

a)

It affects judgement and increases accident risk

b)

It slows productivity only

c)

It damages equipment

18.

What should you do before using unfamiliar equipment, like a new tool delivered just before Christmas?

a)

Ask a colleague to demonstrate

b)

Use it carefully and hope for the best

c)

Ensure you are trained and authorised

19.

Why is signage important on construction sites?

a)

It adds decoration

b)

It communicates hazards, instructions, and emergency information

c)

It replaces supervision

20.

The main aim of health and safety management in construction is to:

a)

Prevent accidents, injuries, and ill health

b)

Increase paperwork

c)

Slow down the project