Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Worksheet MCQs Extraction

Total questions: 35

Worksheet time: 18mins

Name
Class
Date
1.

Continuous improvement that involves all participants

a)

Kaizen

b)

Mass Production

c)

Lean Manufacturing

d)

Independent Variable

2.

ASRS

a)

Active Sugar Retention Silo

b)

Automatic Sensor Retract System

c)

Automated Storage and Retrieval System

d)

Alien Star Retrieval System

3.

CAM means what?

a)

Computer Aided Modeling

b)

Computer Aided Manufacturing

c)

Computer Aided Machine

d)

Computer Aiming Machines

4.

What does CNC Mean?

a)

Computer Numbered Computers

b)

Computer Numerical Control

c)

Computer Not-In Control

d)

Computer Numbering Control

5.

What does CAD Mean?

a)

Computer Assisted Design

b)

Computer Aided Design

c)

Computers Added Diligence

d)

Computer Aided Development

6.

The use of technology to ease human labor or extend the mental or physical capabilities.

a)

Labor

b)

Innovation

c)

Automation

d)

Mechanical Advantage

7.

JIT stands for which of the following?

a)

Justified Inventory Teachings

b)

Just In Time

c)

Just Inventory Tolerance

d)

Judgmental Iconic Terror

8.

Lean manufacturing can best be described as

a)

Limited Resources

b)

Elimination of Time

c)

Elimination of waste

d)

Correct Processing

9.

WIP Stands for which of the following

a)

Work in Progress

b)

Work in Process

c)

Wages in Process

d)

Waste In Process

10.

The use of computers in converting the initial idea for a product into a detailed design.

a)

CIM

b)

CAM

c)

AGV

d)

CAD

11.

A system that uses feedback from the input to control the output.

a)

CAD

b)

Open Loop

c)

Closed Loop

d)

Control System

12.

A system that runs without any feedback to update the output.

a)

Closed Loop

b)

CAD

c)

Open Loop

d)

Control System

13.

A graphical representation of the progress of a system

a)

Manufacturing Process

b)

Sketches

c)

Flow Chart

d)

Design Process

14.

Cost of hiring employees could be considered this

a)

Non-Value Added Cost

b)

Processing Cost

c)

Value-Added Cost

d)

Variable cost

15.

The general, fixed cost of running a business, such as rent, lighting, and heating expenses

a)

Overhead

b)

Value-Added Costs

c)

Profit

d)

Income costs

16.

Basic substance in its natural state, used as an input to a production process

a)

Generic Materials

b)

Raw Materials

c)

Income Materials

d)

Fixed Materials

17.

The quality of equipment or goods still useful after an extended period of time and usage.

a)

Purpose

b)

Defective

c)

Durability

d)

Design Effective

18.

The process of making sure that products or services meet consistently high standards.

a)

Quality Control

b)

Morality

c)

Ethics

d)

Defective Products

19.

A computer-controlled system that uses pallets and other interface equipment to transport work pieces to NC machine tools and other equipment in a flexible manufacturing system.

a)

Automated Storage/Retrieval System

b)

Computer Numerical Control

c)

Computer Aided Design

d)

Automated Guided Vehicle

20.

A variable whose value depends on the value of another variable

a)

Mass Production

b)

Kaizen

c)

Dependent Variable

d)

Six Sigma

21.

Robotics is the science and technology of robots, their design, manufacture, and application.

a)

True

b)

False

22.

A highly structured methodology that incorporates techniques and tools for eliminating defects and variability from a process. To achieve this, a process must not produce more than 3.4 defects per million opportunities.

a)

Lean Manufacturing

b)

Mass Production

c)

Six Sigma

d)

Work-in-Process

23.

A solid-state control system that has a user-programmable memory to store instructions.

a)

Flexible Manufacturing System

b)

Automated Guided Vehicle

c)

Automation

d)

Programmable Logic Controller

24.

A flexible group of CNC machine tools that are highly automated and integrated capable of producing a family of parts.

a)

Kaizen

b)

Flexible Manufacturing System

c)

Lean Manufacturing

d)

Programmable Logic Controller

25.

A line of text in a computer program that is ignored by the computer. Used to explain programs to humans.

a)

"IF" statement

b)

Code

c)

"while" statement

d)

Comment

26.

The diamond-shaped block used for YES/NO questions. These blocks have two outputs: 1 (for yes) and 2 (for no).

a)

Flow Lines

b)

Decision Block

c)

Input and Output Block

d)

Closed Loop

27.

The connecting line or arrow between symbols on a flow chart.

a)

Sequential

b)

Double lines

c)

Dashed Lines

d)

Flow Lines

28.

A variable resistor.

a)

Sonar

b)

Potentiometer

c)

Servo

d)

Line Follower

29.

A representation of a situation or problem with a similar but simpler model or a more easily manipulated model in order to determine experimental results.

a)

Comment

b)

Control System

c)

Iterative

d)

Simulation

30.

A periodic cost that remains (more or less) unchanged irrespective of the output level or sales revenue of a firm.

a)

Overhead

b)

Profit

c)

Raw Materials

d)

Fixed Costs

31.

Imperfect in form or function.

a)

Durability

b)

Competent

c)

Ethics

d)

Defective

32.

The standards for ethical or moral behavior of a particular group. In our case it will be the Engineering Code of Ethics.

a)

Moral

b)

Economics

c)

Competent

d)

Ethics

33.

Rules relating to principles of right and wrong in behavior.

a)

Purpose

b)

Durability

c)

Morality

d)

Defective

34.

The ability of a product to do the job for which it was intended.

a)

Durability

b)

Competent

c)

Purpose

d)

Functionality

35.

Properly or sufficiently qualified; capable or efficient.

a)

Purpose

b)

Competent

c)

Durability

d)

Functionality