EMERGENCY OR TEMPORARY REPAIR USING ELECTRIC ARC AND GAS WELDING

Total questions: 15

Worksheet time: 10mins

Name
Class
Date
1.

During heavy weather, a crack develops on a deck plating near a welded bracket. The team decides to weld a temporary patch. Which factor should guide the shape and placement of the doubler plate?

a)

Stress load path

b)

Paint condition

c)

Deck lighting angle

d)

Weld bead color

2.

A seawater pipeline develops a pinhole leak close to a flange. Hot work is permitted. Which temporary welding action prevents distortion that could worsen the leak?

a)

Low-heat pass

b)

Wide arc sweep

c)

Fast travel speed

d)

Deep root burn

3.

A winch foundation bracket shows a progressive fatigue crack. The repair team plans an emergency weld while the vessel is underway. What is the primary reason for unloading the equipment before welding?

a)

Reduce stress concentration

b)

Improve welder posture

c)

Avoid glare from motion

d)

Protect nearby cabling

4.

A minor hull crack is found just above the waterline. Before applying a temporary patch, the crew drills stop-holes at both ends. What is the purpose of the stop-holes?

a)

Arrest crack growth

b)

Support filler cooling

5.

During the emergency sealing of a thin fuel overflow line, the engineer chooses gas welding instead of SMAW. What justifies this selection?

a)

Lower heat impact

b)

Faster slag removal

c)

Wider bead pattern

d)

Higher spark density

6.

A distorted steel guard on a mooring winch is jamming the drum. Which action justifies the use of oxy-acetylene cutting as part of the emergency repair?

a)

Free critical movement

b)

Reduce crew fatigue

c)

Enhance paint adhesion

d)

Stabilize deck heating

7.

A fractured grab-rail on a gangway must be welded urgently. The area shows salt contamination. What is the technician’s first action before welding the repair?

a)

Remove chloride film

b)

Remove deck signage

c)

Rotate gangway wheels

d)

Test deck vibration

8.

A temporary weld is being planned on the hatch-cover stiffener after impact damage. What welding approach minimizes further deformation?

a)

Short intermittent beads

b)

Wide continuous passes

9.

During emergency padeye repair for cargo lashings, the steel shows slight buckling. What determines whether temporary welding may proceed?

a)

Material soundness

b)

Bolt thread pitch

c)

Paint gloss index

d)

Lighting direction

10.

A crack on a pipe bracket reappears shortly after an emergency fillet weld. What is the most likely reason for failure?

a)

Load not isolated

b)

Rod too expensive

c)

Metal color faded

d)

Joint too polished

11.

A padeye crack is found during cargo operations. The surface is oily, and vibration from the winch continues. Which action ensures a safe temporary weld?

a)

Weld as found with slightly higher heat

b)

Secure machinery, clean surface, add support

c)

Patch directly without removing vibration

d)

Cool the weld with water during operation

12.

Oil or grease must never be used on oxygen fittings because:

a)

It may cause explosion risk

b)

It lowers gas pressure rate

c)

It blocks cylinder valves

d)

It damages the hose seal

13.

A fire watch is required during hot work to:

4 lines
14.

After work, the operator must:

a)

Shut valves and bleed hoses

b)

Tilt cylinders for draining

c)

Cover torch with wet cloth

d)

Remove regulators quickly

15.

When cutting a 10 mm steel plate, gas pressure must be:

a)

Set according to plate thickness

b)

Maintained at lowest safe rate

c)

Equal to acetylene flow rate

d)