wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

1.5 Construction Revision

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

Which feature mainly provides vertical support in cellular construction buildings?

a)

Load-bearing walls carry vertical loads

b)

Curtain walls carry vertical loads

c)

Braced frames carry vertical loads

d)

Light timber studs carry vertical loads

2.

What is the main height limitation of cellular construction?

a)

Deep foundations restrict total height

b)

Thick load-bearing walls restrict total height

c)

Open-plan floors restrict total height

d)

Lightweight roofs restrict total height

3.

Cellular construction is most commonly used for which building type?

a)

Detached timber cottages

b)

Large-span sports arenas

c)

Low-rise flats with repeated rooms

d)

High-rise office towers

4.

Why must walls in cellular construction be thick?

a)

They reduce the need for fire stairs

b)

They allow for large window openings

c)

They improve interior decoration quality

d)

They carry their own weight and upper loads

5.

What typical number of storeys suits cellular construction methods?

a)

About fifteen to twenty storeys

b)

About thirty to forty storeys

c)

About six to ten storeys

d)

About one to two storeys

6.

Which statement best describes skeletal frame construction in rectangular frames?

a)

Floor slabs alone carry the building weight

b)

Internal partitions carry the building weight

c)

External walls carry the building weight

d)

Columns and beams carry the building weight

7.

What role does a rectangular grid play in framed buildings?

a)

Supports floors, roof, and external walls

b)

Only supports decorative cladding

c)

Only supports internal partitions

d)

Only supports roof trusses

8.

What are curtain walls in contemporary framed buildings?

a)

Non-load-bearing exterior cladding

b)

Primary load-bearing masonry

c)

Internal fire separation walls

d)

Temporary site hoardings

9.

In buildings subject to high wind loads, why use a braced frame?

a)

Bracing replaces columns completely

b)

Bracing eliminates foundations entirely

c)

Bracing reduces floor thickness everywhere

d)

Bracing transfers lateral loads effectively

10.

Which frame type is commonly used for contemporary housing?

a)

Heavy pre-stressed concrete

b)

Lightweight timber frame systems

c)

All-steel mega trusses

d)

Masonry-only load walls

11.

Which frames are typically chosen for larger structures?

a)

Steel and reinforced concrete

b)

Light timber stud frames

c)

Aluminium curtain wall frames

d)

Brick cavity wall frames

12.

Why do contractors often prefer timber in frame construction?

a)

Best for extreme building heights

b)

Eliminates acoustic separation needs

c)

Requires no bracing for wind loads

d)

Fast build time and cost benefits

13.

Which component forms the vertical support in a portal frame?

a)

Column

b)

Rafter

c)

Girt

d)

Purlin

14.

What is the main reason portal frames can use thinner beams?

a)

Rigid joints provide stability

b)

Timber is lighter than steel

c)

Shorter spans reduce loads

d)

Roof sheeting adds strength

15.

Typical clear span range for portal frame buildings is:

a)

60 to 100 metres

b)

5 to 12 metres

c)

2 to 8 metres

d)

15 to 50 metres

16.

In a portal frame building, purlins and side rails are part of the:

a)

External finishes

b)

Mechanical services

c)

Primary foundation

d)

Secondary framework

17.

Bracing is added to portal frames primarily to:

a)

Reduce construction time

b)

Provide rigidity against wind

c)

Support roof sheeting weight

d)

Increase thermal insulation

18.

Cold-formed steel components are produced by:

a)

Forging hot billets with hammers

b)

Welding thick plate assemblies

c)

Casting molten steel in molds

d)

Rolling or pressing thin steel sheets

19.

Reinforced concrete portal frames include steel bars called:

a)

Rebar

b)

Stirrups

c)

Nails

d)

Bolts

20.

Laminated timber allows portal frames to:

a)

Achieve longer spans and complex shapes

b)

Replace columns with cables

c)

Eliminate the need for bracing

d)

Avoid using any metal fasteners

21.

Which pair correctly matches element to location in a portal frame?

a)

Knee bracket at column–rafter joint

b)

Apex bracket at base of column

c)

Footing bracket at roof ridge

d)

Purlin at foundation footing

22.

A realistic spacing between portal frames along a building length is:

a)

0.5 to 1 metre

b)

20 to 30 metres

c)

1 to 2 metres

d)

6 to 8 metres

23.

What does it mean when a building is listed?

a)

It is of special architectural or historic interest

b)

It is newer than most buildings in the area

c)

It has passed a routine safety inspection only

d)

It was recently refurbished with modern materials

24.

Which best explains why qualified professionals should maintain listed buildings?

a)

To modernise interiors for current trends

b)

To preserve character and comply with regulations

c)

To reduce project time at all costs

d)

To replace old methods with new ones

25.

Which action aligns with the conservation principle of mitigation?

a)

Record affected features and conceal new services

b)

Remove as much old fabric as possible

c)

Install services without any documentation

d)

Replace original materials with modern plastics

26.

Minimisation in conservation primarily means what?

a)

Choose options that reduce harm and reuse materials

b)

Remove historic details to simplify work

c)

Delay maintenance until major failure occurs

d)

Hide all new work behind false walls

27.

Reversibility in heritage work is best described as what?

a)

Sealing services so they cannot be accessed

b)

Painting over all original surfaces for protection

c)

Making permanent changes that cannot be undone

d)

Planning future removal with minimal disruption

28.

Which set lists traditional trades commonly used on historic buildings?

a)

Plumbing, HVAC balancing, tiling

b)

Aluminium cladding, curtain walling, glazing

c)

Drylining, vinyl flooring, plasterboard

d)

Masonry, timber framing, thatching

29.

Why is traditional maintenance such as masonry and stone carving essential for historic buildings?

a)

It preserves integrity, character, and heritage skills

b)

It guarantees the lowest possible project cost

c)

It allows rapid installation of modern systems

d)

It eliminates the need for any documentation

30.

In which scenario is leadwork most appropriately used on a historic building?

a)

For durable sheeting and ornamental weathering

b)

For lightweight interior partition framing

c)

For insulating roofs with spray foam only

d)

For replacing timber joints with metal bolts