Maintenance and Process Safety Management Worksheet

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

What is the most appropriate definition of maintenance?

a)

Emergency repair of broken equipment

b)

The act of keeping equipment in proper working condition

c)

Replacement of failed components only

d)

Inspection without repair

2.

Which type of maintenance is considered the most expensive approach?

a)

Preventive maintenance

b)

Corrective maintenance

c)

Predictive maintenance

d)

Reactive maintenance

3.

Reactive maintenance mainly involves:

a)

Scheduled replacement of components

b)

Forecasting failures using technology

c)

Repairing equipment only after breakdown

d)

Routine inspection and lubrication

4.

Corrective maintenance activities are usually generated from:

a)

Equipment failure only

b)

Planned inspections and routine service requirements

c)

Emergency shutdowns

d)

Production delays

5.

Preventive maintenance is best described as:

a)

Repairing equipment after failure

b)

Replacing components before failure occurs

c)

Predicting failures using sensors

d)

Emergency maintenance action

6.

Which activity is included in preventive maintenance?

a)

Emergency shutdown

b)

Lubrication and routine inspection

c)

Equipment redesign

d)

Failure investigation

7.

The primary goal of preventive maintenance is to:

a)

Reduce manpower

b)

Increase downtime

c)

Prevent equipment failure

d)

Replace all components

8.

Predictive maintenance differs from preventive maintenance because it:

a)

Focuses only on manual tasks

b)

Is performed after failure

c)

Uses technology to assess equipment condition

d)

Is more expensive than reactive maintenance

9.

The main purpose of a permit-to-work system is to:

a)

Speed up maintenance work

b)

Reduce paperwork

c)

Ensure hazards and precautions are clearly understood

d)

Replace maintenance procedures

10.

Before entering a confined space, which action is essential?

a)

Equipment repainting

b)

Gas testing for oxygen and toxic gases

c)

Production shutdown

d)

Tool inspection only

11.

What is the primary purpose of Process Safety Management (PSM)?

a)

To improve product quality

b)

To manage occupational injuries only

c)

To identify and manage process risks

d)

To reduce production costs

12.

PSM is best described as:

a)

A maintenance management system

b)

A safety management system specific to process industries

c)

A quality assurance framework

d)

A personal protective equipment program

13.

The ultimate goal of PSM is to prevent:

a)

Minor workplace injuries

b)

Equipment downtime

c)

Major hazard incidents

d)

Production delays

14.

PSM applies management principles in a _____ manner to prevent loss of containment events.

a)

Reactive

b)

Passive

c)

Proactive

d)

Corrective

15.

According to the background of PSM, which organization issued the PSM rules (29 CFR 1910.119)?

a)

EPA

b)

WHO

c)

OSHA

d)

ISO

16.

Which of the following best defines process safety culture?

a)

Written safety procedures only

b)

Individual worker attitudes toward safety

c)

Group values and behaviors that determine how process safety is managed

d)

Compliance with legal standards

17.

Which PSM element focuses on identifying hazards and evaluating risks throughout the process life cycle?

a)

Workforce Involvement

b)

Hazard Identification and Risk Analysis

c)

Incident Investigation

d)

Management Review

18.

Operating procedures in PSM should primarily ensure that:

a)

Production targets are met

b)

Operators understand hazards and controls

c)

Maintenance costs are minimized

d)

Equipment design is improved

19.

Lockout–Tagout (LOTO) is an example of:

a)

Operating procedure

b)

Emergency management

c)

Safe work practice

d)

Incident investigation

20.

The main purpose of Management of Change (MOC) is to:

a)

Improve production efficiency

b)

Eliminate all hazards

c)

Ensure changes do not introduce new or increased risks

d)

Replace existing operating procedures