Design and Modeling Pretest

Total questions: 17

Worksheet time: 9mins

Name
Class
Date
1.

What is the first step in the design process?

a)

Build a prototype

b)

Define the problem

c)

Test the solution

d)

Present the solution

2.

What is the main purpose of brainstorming in the design process?

a)

To test the prototype

b)

To generate ideas

c)

To measure dimensions

d)

To write a report

3.

Which step comes after "Develop a Solution" in the design process?

a)

Identify the Problem

b)

Construct and Test a Prototype

c)

Evaluate the Solution

d)

Present the Solution

4.

You are given a problem to design a bridge that can hold 10 kg. What is the first thing you should do?

a)

Build the bridge

b)

Identify the requirements and constraints

c)

Test different materials

d)

Draw the final design

5.

A team has three different designs for a toy car. How should they decide which design to build?

a)

Pick the one that looks best

b)

Test each design and compare results

c)

Choose the cheapest one

d)

Ask a friend

6.

If a prototype fails during testing, what should the team do next?

a)

Give up on the project

b)

Analyze the failure and improve the design

c)

Ignore the results

d)

Start a new project

7.

You need to design a container to hold both hot and cold liquids. What should you consider first?

a)

The color of the container

b)

The materials that can handle temperature changes

c)

The price of the container

d)

The size of the label

8.

Which of the following is an example of a constraint in a design project?

a)

The project must be completed in one week

b)

The project is fun

c)

The project uses blue paint

d)

The project is for school

9.

What is a prototype?

a)

A final product

b)

A working model used for testing ideas

c)

A drawing of the design

d)

A written report

10.

A student wants to improve their design after testing. What is the best way to do this?

a)

Make random changes

b)

Review test results and make specific improvements

c)

Start over completely

d)

Ask someone else to do it

11.

What are constraints in a project?

a)

The goals set for project success.

b)

Limitations on a design like available materials, cost of materials, or available time

c)

The tools used to manage project tasks.

d)

The ideas generated by the people in the group.

12.

What is the measurement of the RED line?

a)

1 1/4"

b)

1 3/4"

c)

1 1/2"

d)

1 3/8"

13.

What is the measurement of the blue line?

a)
4 1/2
b)
3 7/8
c)
2 3/4
d)
5 1/8
14.

The pink line=___centimeters (cm)

a)

4.5 cm

b)
6 cm
c)
8 cm
d)
2 cm
15.

The Metric System is based on the number 10 because?

a)

We have ten fingers

b)

We have ten eyes

c)

We two thumbs

d)

It was the favorite number of the inventor of the metric system.

16.

What is the length of the colored line above? Answer using millimeters

a)

80 mm

b)

93 mm

c)

100 mm

d)

55 mm

17.

What do engineers do?

a)
Engineers primarily focus on marketing strategies.
b)
Engineers only work in the field of software development.
c)
Engineers manage financial investments for companies.
d)

Engineers apply scientific principles to analyze, design, invent, code, build, and create to solve all sorts of problems and make the world a better place