Contracts (ANJ)

Total questions: 5

Worksheet time: 3mins

Name
Class
Date
1.


Which of the following is NOT a requirement for a valid contract under the Indian Contract Act?

a)

Free consent of parties

b)

Lawful consideration

c)

A minimum of three witnesses

d)

Competency of parties

2.

In construction, what is the primary objective of a 'Breach of Contract' clause?

a)

To define remedies when a party fails to perform their duties

b)

To increase the project cost automatically

c)

To allow the contractor to leave the site anytime

d)

To change the project design

3.

According to the Indian Contract Act 1872, what is the fundamental definition of a contract?

a)

A signed document between a contractor and an owner

b)

An agreement enforceable by law

c)

Any verbal promise between two people

d)

A set of drawings and specifications

4.

What is a major advantage of a 'Lump Sum Contract' for a project owner?

a)

Total cost is known before work begins

b)


The owner takes all the risk of material price hikes

c)

It is easy to make changes during construction

d)

No detailed drawings are required

5.

Which contract type is most suitable for works where the exact quantities cannot be determined in advance, such as earthwork or road construction?

a)

Labour contract

b)

Item rate (Unit Price) contract

c)

Demolition contract

d)

Lump sum contract