Planned Preventative Maintenance Assessment 1

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What is the main aim of Planned Preventative Maintenance (PPM)?

a)

To repair equipment after it fails

b)

To prevent equipment failure through planned servicing

c)

To reduce the number of maintenance workers

d)

To avoid keeping maintenance records

2.

Which type of maintenance is carried out only after a fault has occurred?

a)

Planned maintenance

b)

Condition-based maintenance

c)

Preventative maintenance

d)

Reactive maintenance

3.

Which of the following is a key requirement of Planned Preventative Maintenance?

a)

Emergency call-outs

b)

No documentation

c)

A maintenance schedule

d)

Unknown maintenance costs

4.

What document lists all items of equipment and their maintenance history?

a)

Risk assessment

b)

Method statement

c)

Asset register

d)

Purchase order

5.

Why is PPM generally safer than reactive maintenance?

a)

It removes the need for inspections

b)

It ensures faults are dealt with before they cause harm

c)

It is cheaper in all cases

d)

It only uses new equipment

6.

Which of the following is a disadvantage of reactive maintenance?

a)

Low initial cost

b)

Reduced planning requirements

c)

Increased likelihood of unexpected breakdowns

d)

Suitable for low-risk equipment

7.

Which type of maintenance normally has more unpredictable costs?

a)

Planned Preventative Maintenance

b)

Scheduled maintenance

c)

Condition monitoring

d)

Reactive maintenance

8.

Planned Preventative Maintenance is usually based on:

a)

User complaints only

b)

Random inspections

c)

Manufacturer recommendations and legal requirements

d)

Equipment failure

9.

Which situation is reactive maintenance most suitable for?

a)

Safety-critical systems

b)

Fire alarms

c)

Lifting equipment

d)

Low-risk, non-essential equipment

10.

Which of the following best describes the difference between PPM and reactive maintenance?

a)

PPM is unplanned; reactive is planned

b)

PPM occurs after failure; reactive prevents failure

c)

PPM is proactive; reactive responds to breakdowns

d)

Both occur only when equipment fails