1.

Which listed task involves excavation rather than construction of concrete structures?

a)

Armature installation measured in

b)

Concrete base B25 construction measured in cubic meters

c)

Foundation pit digging measured in cubic meters

d)

Concrete B30 placement measured in cubic meters

e)

Bitumen B15 pouring measured in cubic meters

2.

Which pipeline activity would most directly increase the total trench length recorded as 14.13 m?

a)

Applying extra waterproofing layers

b)

Adding more armature bars by weight

c)

Pouring bitumen B15 into joints

d)

Increasing concrete B25 volume used

e)

Excavating additional trench segments

3.

If armature totals 1486.44 kg for the pipeline and 343.34 kg for head and wing sections combined, what planning choice reduces total steel demand?

a)

Add backfill volume to stabilize foundations

b)

Increase waterproofing area in both sections

c)

Raise concrete grade from B25 to B30 throughout

d)

Optimize reinforcement layout to eliminate redundancy

e)

Decrease trench length while maintaining section count

4.

A planner wants to verify volumes for the wing section. Which value corresponds to concrete B25 used there?

a)

1.08 cubic meters for wing concrete

b)

1.05 cubic meters for head concrete

c)

151.40 kilograms of armature

d)

97.43 square meters trench waterproofing

e)

10.68 square meters waterproofing

5.

What is the unit used to measure the quantity of rebar in the schedule?

a)

Kilograms (kg)

b)

Meters (m)

c)

Square meters (m²)

d)

Cubic meters (m³)

6.

Identify the correct thickness specified for the protective layer against water ingress and garage moisture.

a)

40 mm

b)

150 mm

c)

400 mm

d)

200 mm

7.

Which entry refers to a drainage slope with a specified height?

a)

Drain slope h=20 mm

b)

Drain slope h=40 mm

c)

Drain slope h=400 mm

d)

Drain slope h=200 mm

8.

Select the correct total quantity for rebar as recorded in the table.

a)

969.38 kg

b)

59.25 kg

c)

3.94 kg

d)

29.40 kg

9.

The drawings specify a concrete base under the culverts. For historical drainage works, why was a concrete base preferred over compacted soil alone?

a)

Resist settlement and maintain alignment

b)

Allow faster vegetation growth around pipes

c)

Reduce material transport costs to site

d)

Increase the pipe’s acoustic properties

10.

Identify the primary purpose of the plan labeled “ПЛАН 1:100” shown in the diagram with hexagonal hatching and central conduit.

a)

Drafting a railway signal foundation

b)

Planning a drainage culvert structure

c)

Mapping a medieval city wall segment

d)

Designing a fortified bridge abutment

11.

One note indicates “Төмөр бетон хоолойн арматурын хамгаалалт нь 50мм байна.” What is the implication for reinforcement detailing?

a)

Provide 50 mm concrete cover

b)

Limit bar lap to 50 mm

c)

Space stirrups at 50 mm

d)

Use 50 mm diameter rebar

12.

Why would standards like “MNS 5829:2007” be cited in a civil plan of this type?

a)

Avoid calculating structural loads

b)

Increase drawing aesthetic quality

c)

Reduce the need for on-site testing

d)

Ensure compliance with national codes

13.

The plan dimensions indicate “2000” on each end flared section. Interpreting scale 1:100, what real-world length does 2000 represent?

a)

Two hundred millimeters length

b)

Twenty meters actual length

c)

Two meters actual length

d)

Two hundred meters actual length

14.

Identify the most plausible material referenced by the symbol "Ø1,0φ төмөрбетон хоолой" appearing near roles and notes.

a)

Cast iron bridge deck plate, 1.5 m

b)

Timber flume element, 2.0 m span

c)

Pressed clay sewer tile, 0.5 m width

d)

Reinforced concrete pipe, 1.0 m diameter

e)

Woven reed culvert segment

15.

If the project sheet is dated "2023 оны 01 сар", what administrative implication does this have for document control?

a)

It defines the fiscal year’s end date

b)

It records the average winter temperature

c)

It indicates the drafting month for versioning

d)

It states the material delivery deadline

e)

It sets the timeline for public holidays