Unit 04 Recap MCQ Exam: PPTs 1-3

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

The Health and Safety at Work etc. Act 1974 is:

a)

A Code of Practice

b)

An Enabling Act (primary legislation)

c)

A Statutory Instrument

d)

A Guidance Note

2.

Which document is a Statutory Instrument (secondary legislation)?

a)

IET On-Site Guide

b)

BS 7671

c)

The Electricity at Work Regulations 1989

d)

IET Guidance Note 3

3.

The phrase "so far as is reasonably practicable" in HASAWA means:

a)

Safety measures must be taken at any cost

b)

Safety measures don't need to be taken if expensive

c)

Measures must be taken unless cost is grossly disproportionate to risk

d)

Only basic safety measures are required

4.

The Management of Health and Safety at Work Regulations 1999 requires employers to:

a)

Provide free PPE to all employees

b)

Carry out a suitable risk assessment

c)

Employ a full-time safety officer

d)

Display the health and safety law poster

5.

Which regulation has "absolute" requirements (no "reasonably practicable" relaxation)?

a)

Health and Safety at Work etc. Act 1974

b)

Provision and Use of Work Equipment Regulations 1998

c)

Electricity at Work Regulations 1989 (e.g., sound connections)

d)

Building Regulations 2010

6.

Part S of the Building Regulations applies to:

a)

Electrical safety in dwellings

b)

Infrastructure for charging electric vehicles

c)

Fire safety in commercial buildings

d)

Structural stability

7.

BS 7671 (IET Wiring Regulations) is primarily:

a)

UK primary law

b)

The national standard for electrical installations

c)

Guidance for electricians only

d)

A replacement for the EAWR

8.

The IET On-Site Guide is best described as:

a)

A legally-binding version of BS 7671

b)

A guide to BS 7671 that doesn't guarantee compliance

c)

A document for architects only

d)

The primary source for electrical design

9.

A document providing practical guidance on complying with legal obligations is a:

a)

Statutory Instrument

b)

British Standard

c)

Code of Practice

d)

Manufacturer's instruction

10.

Which is a NON-Statutory document?

a)

The Electricity at Work Regulations 1989

b)

IET Guidance Note 3: Inspection & Testing

c)

The Management of Health and Safety at Work Regulations 1999

d)

Part P of the Building Regulations

11.

A "Safe System of Work" is:

a)

A list of required tools

b)

A hazard list

c)

A set of procedures for carrying out work

d)

A permit for confined spaces

12.

The systematic process of identifying hazards and evaluating risks is:

a)

A Method Statement

b)

A Risk Assessment

c)

A Permit to Work

d)

A Site Survey

13.

A Method Statement primarily:

a)

Identifies first aid responsibility

b)

Records weather conditions

c)

Details step-by-step task procedures

d)

Calculates material costs

14.

A 'Permit to Work' is typically required for:

a)

Installing a socket in an office

b)

Working on live equipment or confined spaces

c)

Unloading materials

d)

Completing risk assessments

15.

The FIRST step in the HSE's 5-step risk assessment is:

a)

Record findings

b)

Identify hazards

c)

Evaluate risks

d)

Identify who might be harmed

16.

In the Hierarchy of Control, the MOST effective measure is:

a)

Personal Protective Equipment (PPE)

b)

Warning signs

c)

Machine guards

d)

Eliminating the hazard

17.

If you employ five or more people, you must:

a)

Display risk assessments publicly

b)

Record significant findings of risk assessments

18.

Safe access and egress is specifically required by:

a)

Building Regulations only

b)

Workplace Regulations 1992

c)

Electricity at Work Regulations only

d)

No specific legislation

19.

A document breaking down high-risk tasks into sequential safety steps is a:

a)

Risk Assessment

b)

Method Statement

c)

Permit to Work

d)

Schedule of Condition

20.

For investigating a fault on a live 400V distribution board, you need:

a)

Risk Assessment

b)

Method Statement

c)

Permit to Work

d)

Site Induction record

21.

A 'schedule of condition' before work is to:

a)

Satisfy building control

b)

Record property state to protect against damage claims

c)

Plan cable routes

d)

Calculate waste

22.

The BEST evidence for a schedule of condition is:

a)

Verbal agreement

b)

Handwritten list

c)

Dated photographs/video

d)

Note from previous contractor

23.

Who should agree to the schedule of condition before work?

a)

The electrician only

b)

Site manager only

c)

The client or representative

d)

Building control

24.

To protect a finished oak floor in an access hallway:

a)

Work carefully

b)

Clean shoes thoroughly

c)

Cover with protective boards/plastic

d)

Ask client not to use it

25.

If furniture cannot be removed from work area:

a)

Work around it carefully

b)

Move it yourself

c)

Cover with dust sheets

d)

Ask client to hold it

26.

To make good a plaster wall while maintaining fire safety:

a)

Use any filler

b)

Use polystyrene

c)

Use plaster (non-combustible)

d)

Use timber battens

27.

If decorative wallpaper is damaged:

a)

Ignore it (cosmetic only)

b)

Glue it back with any adhesive

c)

Inform client at job end

d)

Repair with matching wallpaper using proper techniques

28.

Pre-existing damage checks should cover areas affected by:

a)

Physical installation only

b)

All work activities (delivery, setup, cleaning, waste removal)

c)

Final testing only

d)

Client's movements only

29.

Protecting building fabric during work is important to:

a)

Make job take longer

b)

Limit damage and maintain safety

c)

Satisfy Building Regulations for new builds only

d)

Avoid using dust sheets

30.

Finding a large pre-existing crack before chasing a wall, FIRST:

a)

Chase anyway (not your problem)

b)

Document with photo and inform client immediately

c)

Fill crack before starting

d)

Avoid that section without telling anyone