wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Production Logging (PLT) and MPLT Worksheet

Total questions: 11

Worksheet time: 11mins

Name
Class
Date
1.

What is the primary purpose of Production Logging (PLT)?

a)

Directional drilling control

b)

Measure casing thickness

c)

Cement bond evaluation

d)

Determine how much and what type of fluid is flowing in the wellbore

2.

Which sensor in an MPLT tool is used to measure fluid velocity?

a)

Gamma Ray

b)

Spinner

c)

Pressure sensor

d)

Temperature sensor

3.

Which two parameters are commonly measured by MPLT sensors?

a)

Flow rate and fluid type

b)

Resistivity and porosity

c)

Casing corrosion and stress

d)

Lithology and grain size

4.

Which condition should be considered before performing an MPLT survey?

a)

Well flow condition

b)

Wellhead color

c)

Rig availability

d)

Drilling mud weight

5.

Which sensor is primarily used to differentiate fluid types in MPLT?

a)

Gamma Ray

b)

Capacitance / Density sensor

c)

Caliper

d)

CCL

6.

Why is a shut-in survey conducted during an MPLT operation?

a)

To confirm cross-flow information

b)

To clean the wellbore

c)

To increase well production

d)

To establish baseline pressure and temperature

7.

Which sensor is considered the “heart” of an MPLT toolstring?

a)

Gamma Ray

b)

Pressure sensor

c)

Spinner / Flowmeter

d)

Capacitance sensor

8.

Which PLT operation step is performed to ensure wellbore clearance before logging?

a)

Shut-in survey

b)

Pressure build-up

c)

Flow profiling

d)

Drift run

9.

Which well condition is required before running a PLT survey?

a)

The well must be killed

b)

The well must be cased only

c)

The well must flow in a stable manner

d)

The well must be horizontal

10.

Why are PLTs often run to identify water production problems?

a)

Unexpected water can reduce hydrocarbon production

b)

Water increases tubing strength

c)

Water affects surface separator calibration

d)

Water has no impact on production

11.

Which platform is mainly used for accommodation of personnel offshore?

a)

WP (Wellhead Platform)

b)

FP (Flare Platform)

c)

LQ (Living Quarter)

d)

CPP (Central Production Platform)