All electrical test probes and leads used in safe isolation must comply with standards set by:
BS EN 60898
BS 7671
HSE GS 38
IET Regulations Part 2
When carrying out safe isolation, which should be used?
Neon screwdriver
Multimeter
Volt stick
Approved voltage indicator
EAWR requires that:
Only persons with suitable knowledge/experience may work
Only duty holders may work
Only time-served electricians
Only supervised apprentices
Electrical safety is best achieved by:
Isolating and securing the supply
Switching supply off
Working during quiet hours
Wearing gloves
Unless justified, electricians should always work on:
Dead circuits
Live circuits
RCD circuits
SELV circuits
Law prohibiting live working except in exceptional circumstances:
PUWER
PPE Regs 1992
BS 7671
Electricity at Work Regs 1989
More than one person working on a circuit requires:
Mortise clasp
Multi-lock hasp
Cable ties
Multi-key lock
Which regulation ensures safe inspection of electrical systems?
EAWR 1989
HSWA 1974
Management of Health & Safety
COSHH
Most serious result of not safely isolating:
Incarceration
Imprisonment
Quick timescales
Death
Purpose of ensuring systems work as intended:
Testing equipment
Inspecting systems
Commissioning systems
Isolating systems
Initial verification confirms compliance with:
BS 7671 in every regard
BS 7671 reasonably practicable
HSE requirements
EAWR 1989
Reason for initial verification:
Correct type & BS
Correct size & BS
Correct rating & BS
Correct colour & BS
Initial verification ensures installation is:
Correctly selected and erected
Finished and sealed
Not defective
Not visibly damaged
Required before initial inspection:
Equipment costing
Earthing system
Maximum demand
Supply characteristics
Most appropriate human senses for testing:
Intuition & speech
Taste & pain
Touch & feel
Touch & sight
Inspection/testing should:
Only after completion
Midway
During & on completion
Within 1 month
Most appropriate to verify initial verification:
Basic protection
Equipment suitability
Termination & cable selection
Storage
Most appropriate in establishing safety:
Fault protection
Basic protection
Correct sequence:
Inspection before testing
Testing before inspection
Testing more important
Inspection more important
Testing results should be compared to:
Other installations
BS 7671
Designer requirements
EAWR
First test in initial verification:
Polarity
Continuity of CPC
Functional
Loop impedance
Fault protection includes:
Earthing Class II
RCD if Ze high
Equipotential bonding
Earthing Class I
CPC continuity important because:
Easier to see
Smaller
Larger
Safety critical
Voltage used to calculate resistance of bonding conductors:
110 V
50 V
400 V
230 V
IR tester setting for 230 V installation:
<50 V
500 V
<500 V
>2× supply but <1000 V
Satisfactory insulation resistance:
<1 Ω
<0.5 MΩ
Not <0.5 MΩ
Not <1 MΩ
Calibration certificates valid for:
3 months
1 year
3 years
5 years
Correct order of dead tests:
CPC → live polarity → loop
CPC → dead polarity → loop
CPC → IR → loop
CPC → IR → polarity
To obtain R1+R2 in ring circuit, r1+r2 must be:
÷4
÷3
÷1.67
×1.67
Ring circuit spurs:
One unfused spur → high readings
Any number unfused → high readings
Any number fused → high readings
One fused → high readings
CPC vs live/neutral ratio for 1 mm² cable:
CPC > neutral
CPC < neutral
CPC > line & neutral
CPC < line & neutral
Tong test instrument =
Continuity tester
Clip-on ammeter
IR tester
Voltage indicator
Dead polarity verifies:
Lampholder outer to line
Lampholder fused
Lampholder centre to neutral
Lampholder centre to line
Circuits in parallel will:
Reduce resistance
Increase resistance
Halve resistance
Double resistance
Increasing length of circuit will:
Reduce IR
Increase IR
Halve IR
Double IR
Before IR test consider:
Sensitive loads removed
Loads & capacitors removed
Circuit IR=1 MΩ according to BS 7671:
Does not comply
Complies
No further investigation
Further investigation required
Polarity definition:
Switching all conductors
Switching line
Switching neutral
Switching CPC
Loop impedance values can be read from:
GN3
BS 7671
OSG
GS38
Total loop impedance obtained by:
Measuring Zs
Enquiry Ze + R1+R2
Enquiry Zs
Measuring Ze + R1+R2
Live polarity tests connect across:
Line–line
Neutral–line
Phase–earth
Line–earth
To check CB breaking capacity, which senses needed?
Touch
Sight
Taste
Sound
Recommended domestic re-test period:
3 months
3 years
5 years
10 years
Two small additions require:
Minor works certificate
Two minor works certificates
One EIC
Two EICs
Following completion of new installation issue:
Test schedule
EICR
EIC
Inspection schedules
Following completion:
Inspector keeps copy of EIC
Inspector keeps original
Customer keeps copy
Customer given original