1.

In Activity-on-Node representation, what do the vertices (boxes) in the network depict?

a)

Resource assignments

b)

The activities themselves

c)

Activity durations

d)

Project milestones

2.

How should an activity network be spatially arranged to show precedence among activities?

a)

Predecessors drawn to the left of successors

b)

Critical path drawn at the bottom

c)

Longest duration drawn nearest the start

d)

Successors drawn above predecessors

3.

In the illustrated network, activities A and B precede D. Which statement correctly explains this layout convention?

a)

Preceding activities are merged into the successor node

b)

Preceding activities are stacked vertically under successors

c)

Preceding activities are omitted once the successor is drawn

d)

Preceding activities are placed to the left of the successor

4.

Where is activity duration commonly noted within an AoN box, as shown in the example?

a)

Left-side field

b)

Middle-bottom field

c)

Top-center field

d)

Right-side field