WorksheetsConstructing Activity Networks
Total questions: 4
Worksheet time: 2mins
In Activity-on-Node representation, what do the vertices (boxes) in the network depict?
Resource assignments
The activities themselves
Activity durations
Project milestones
How should an activity network be spatially arranged to show precedence among activities?
Predecessors drawn to the left of successors
Critical path drawn at the bottom
Longest duration drawn nearest the start
Successors drawn above predecessors
In the illustrated network, activities A and B precede D. Which statement correctly explains this layout convention?
Preceding activities are merged into the successor node
Preceding activities are stacked vertically under successors
Preceding activities are omitted once the successor is drawn
Preceding activities are placed to the left of the successor
Where is activity duration commonly noted within an AoN box, as shown in the example?
Left-side field
Middle-bottom field
Top-center field
Right-side field