WorksheetsEarthmoving Operations Trade Terms Worksheet (Grade 9)
Total questions: 30
Worksheet time: 15mins
Part A: Matching (2 points each). Select the correct definition for Earthmoving.
Any activity involving digging, loading, hauling, and dumping earth material
The earth's foundation consisting of hard, dense rock materials
A permanently set reference point used for placing other stakes
Constructed fill made of earth or rock materials
Part A: Matching (2 points each). Select the correct definition for Bedrock.
The earth's foundation consisting of hard, dense rock materials
Material replaced in an excavated area
The top surface of groundwater
Finish grade stakes placed by surveyors to guide finishing work
Part A: Matching (2 points each). Select the correct definition for Benchmark.
A permanently set reference point used for placing other stakes
Road used by construction equipment to transport materials
The removal of soil by water or wind
Constructed fill made of earth or rock materials
Part A: Matching (2 points each). Select the correct definition for Blue tops.
Finish grade stakes placed by surveyors to guide finishing work
The rise and fall of the constructed surface relative to the horizontal plane
Open pit or hole built to collect groundwater
Area where water completely fills spaces between soil particles
Part A: Matching (2 points each). Select the correct definition for Clearing.
The removal of objects above the original ground
The removal of objects below ground
Any activity involving digging, loading, hauling, and dumping earth material
The process by which moisture wicks up through soil
Part A: Matching (2 points each). Select the correct definition for Grubbing.
The removal of objects below ground
The removal of objects above the original ground
Water from rain and snow that flows over ground surface rather than being absorbed
Very fine particles less than 0.001 inches in diameter
Part A: Matching (2 points each). Select the correct definition for Erosion.
The removal of soil by water or wind
Soil that has been moved from its original place by wind, water, or other means
The top surface of groundwater
Constructed fill made of earth or rock materials
Part A: Matching (2 points each). Select the correct definition for Sediment.
.
Soil that has been moved from its original place by wind, water, or other means
The removal of soil by water or wind
Very fine particles less than 0.001 inches in diameter
Water from rain and snow that flows over ground surface rather than being absorbed
Part A: Matching (2 points each). Select the correct definition for Water table.
The top surface of groundwater
Open pit or hole built to collect groundwater
Area where water completely fills spaces between soil particles
The earth's foundation consisting of hard, dense rock materials
Part A: Matching (2 points each). Select the correct definition for Embankment.
Constructed fill made of earth or rock materials
Material replaced in an excavated area
Road used by construction equipment to transport materials
Finish grade stakes placed by surveyors to guide finishing work
Part A: Matching (2 points each). Select the correct definition for Backfill.
Material replaced in an excavated area
Constructed fill made of earth or rock materials
The removal of objects above the original ground
Property of soil particles having strong attraction to each other
Part A: Matching (2 points each). Select the correct definition for Grade.
The rise and fall of the constructed surface relative to the horizontal plane
Finish grade stakes placed by surveyors to guide finishing work
A permanently set reference point used for placing other stakes
The process by which moisture wicks up through soil
Part A: Matching (2 points each). Select the correct definition for Sump.
Open pit or hole built to collect groundwater
Area where water completely fills spaces between soil particles
The top surface of groundwater
The removal of soil by water or wind
Part A: Matching (2 points each). Select the correct definition for Haul road.
Road used by construction equipment to transport materials
Any activity involving digging, loading, hauling, and dumping earth material
Constructed fill made of earth or rock materials
A permanently set reference point used for placing other stakes
Part A: Matching (2 points each). Select the correct definition for Cohesive.
Property of soil particles having strong attraction to each other
Very fine particles less than 0.001 inches in diameter
The ability of wet clay to be molded and rolled into ribbons
The process by which moisture wicks up through soil
Part A: Matching (2 points each). Select the correct definition for Plasticity.
The ability of wet clay to be molded and rolled into ribbons
Property of soil particles having strong attraction to each other
Very fine particles less than 0.001 inches in diameter
Open pit or hole built to collect groundwater
Part A: Matching (2 points each). Select the correct definition for Capillary action.
The process by which moisture wicks up through soil
The top surface of groundwater
Water from rain and snow that flows over ground surface rather than being absorbed
A permanently set reference point used for placing other stakes
Part A: Matching (2 points each). Select the correct definition for Colloids.
Very fine particles less than 0.001 inches in diameter
Soil that has been moved from its original place by wind, water, or other means
Property of soil particles having strong attraction to each other
The removal of soil by water or wind
Part A: Matching (2 points each). Select the correct definition for Zone of saturation.
Area where water completely fills spaces between soil particles
The top surface of groundwater
Open pit or hole built to collect groundwater
Water from rain and snow that flows over ground surface rather than being absorbed
Part A: Matching (2 points each). Select the correct definition for Stormwater runoff.
Water from rain and snow that flows over ground surface rather than being absorbed
The removal of soil by water or wind
The process by which moisture wicks up through soil
Road used by construction equipment to transport materials
Part B: Fill in the Blank (2 points each). The ______ is the federal agency that requires contractors to obtain permits for sites disturbing one or more acres.
Environmental Protection Agency (EPA)
Occupational Safety and Health Administration (OSHA)
Mine Safety and Health Administration (MSHA)
U.S. Department of Transportation (DOT)
Part B: Fill in the Blank (2 points each). ______ is the term for all excavation until the contractor defines how much is rock versus soil.
Unclassified excavation
Classified excavation
Borrow excavation
Common excavation
Part B: Fill in the Blank (2 points each). An ______ is any open excavation made to obtain materials of value such as coal or mineral ore.
Trench
Shaft
Open pit
Sump
Part B: Fill in the Blank (2 points each). The ______ governs mining safety and operations in the United States.
Mine Safety and Health Administration (MSHA)
Occupational Safety and Health Administration (OSHA)
Environmental Protection Agency (EPA)
U.S. Army Corps of Engineers
Part B: Fill in the Blank (2 points each). ______ are the principal guides for grading operations and should not be disturbed by equipment.
Blue tops
Benchmarks
Haul roads
Sumps
Part C: Short Definitions (3 points each). Select the best definition for As-built plans.
Drawings that show actual constructed dimensions and locations after work is completed
Written project requirements for materials and workmanship
Legal right or corridor granted for transportation or utilities across property
Meeting held before work starts to review project requirements
Part C: Short Definitions (3 points each). Select the best definition for Right-of-way.
Legal right or corridor for passage or placement of public infrastructure across property
Drawings that show actual constructed dimensions and locations after work is completed
Permit regulating stormwater discharges from construction sites
Constructed fill made of earth or rock materials
Part C: Short Definitions (3 points each). Select the best definition for Specifications.
Written project requirements describing materials, workmanship, and performance standards
Drawings that show actual constructed dimensions and locations after work is completed
Legal right or corridor for passage or placement of infrastructure
Permit regulating stormwater discharges from construction activities
Part C: Short Definitions (3 points each). Select the best definition for Preconstruction conference.
Meeting held before work starts to review plans, specifications, permits, and coordination
Legal right or corridor for passage or placement of infrastructure
Written project requirements describing materials and workmanship
Open excavation made to obtain materials of value such as mineral ore
Part C: Short Definitions (3 points each). Select the best definition for NPDES permit.
National Pollutant Discharge Elimination System permit regulating stormwater discharges
Permit granting right-of-way across private property
Written project requirements describing materials and workmanship
Drawings documenting the final built conditions of a project