Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

02-02-26 up to contaimnet

Total questions: 31

Worksheet time: 16mins

Name
Class
Date
1.

Which document provides legally enforceable safety standards in the workplace?

a)

Risk Assessment

b)

Health and Safety at Work Act

c)

Method Statement

d)

Approved Code of Practice (ACoP)

2.

What is the main purpose of the Electricity at Work Regulations?

a)

To ensure all electrical installations are inspected annually

b)

To prevent danger from electricity in the workplace

c)

To require the use of only certified electricians for repairs

d)

To set limits on the voltage used in commercial buildings

3.

Which regulation specifically addresses the use of electrical equipment in flammable atmospheres?

a)

CDM (Construction Design and Management Regulations)

b)

DSEAR (Dangerous Substances and Explosive Atmospheres Regulations)

c)

PUWER (Provision and Use of Work Equipment Regulations)

d)

ATEX (Atmosphères Explosibles Directive)

4.

What is the primary purpose of the Construction (Design and Management) Regulations?

a)

To set out procedures for site access and security

b)

To ensure health, safety, and welfare in construction projects

c)

To specify requirements for building aesthetics and style

d)

To regulate the use and disposal of construction materials

5.

Which of these is a non-statutory document?

a)

BS 7671 Wiring Regulations

b)

Electricity at Work Regulations 1989

c)

Control of Substances Hazardous to Health (COSHH) Regulations

d)

Health and Safety at Work Act 1974

6.

Which Act places a duty on employers to ensure the health and safety of employees?

a)

Supply of Goods and Services Act

b)

Health and Safety at Work Act

c)

Control of Substances Hazardous to Health Regulations

d)

Workplace (Health, Safety and Welfare) Regulations

7.

What is a safe system of work?

a)

A checklist for cleaning equipment

b)

A set of procedures to carry out work safely

c)

A risk assessment for hazardous substances

d)

A method statement for site access

8.

Which of these is the first step in a risk assessment?

a)

Review previous incidents

b)

Identify hazards

c)

Carry out a cost-benefit analysis

d)

Determine the likelihood of harm

9.

What is a method statement?

a)

A schedule of work hours

b)

A document detailing steps to complete a task safely

c)

A record of site inductions

d)

A risk assessment for hazardous substances

10.

Which document must be completed and authorised before starting high-risk activities on site?

a)

Risk assessment form

b)

Site diary

c)

Permit to Work

d)

Method statement

11.

Which hierarchy of control is most effective?

a)

Administrative controls

b)

PPE

c)

Elimination

d)

Substitution

12.

Who might be harmed is considered in which step of risk assessment?

a)

Step 4: Record your findings and implement them

b)

Step 2: Decide who might be harmed and how

c)

Step 1: Identify the hazards in the workplace

d)

Step 3: Evaluate the risks and decide on precautions

13.

What is a schedule of condition used for?

a)

Tracking equipment inventory

b)

Describing the general condition of premises before work

c)

Recording the maintenance history of machinery

d)

Assessing the suitability of materials for a project

14.

Before starting work, what should be done to record existing conditions?

a)

File a checklist detailing all observed hazards and site features

b)

Take photos or video as visual evidence of the current site conditions

c)

Consult a supervisor to verbally confirm the site’s readiness

d)

Notify the insurance company to log the site status before work begins

15.

Why should access and egress points be covered before work begins?

a)

To prevent damage to flooring

b)

To comply with health and safety regulations

c)

To reduce the risk of slips, trips, and falls

d)

To ensure emergency exits remain visible

16.

If damage occurs during work, what should be used to make good?

a)

Scrap wood from the site, provided it matches the specification and is approved

b)

Materials matching the original, sometimes non-combustible, to maintain safety and integrity

c)

Any available material, as long as it is cost-effective

d)

Notify the supervisor and await further instructions before proceeding

17.

What is the main purpose of checking for pre-existing damage?

a)

To document the condition for future reference

b)

To avoid being held responsible for existing damage

c)

To ensure compliance with local regulations and industry standards

d)

To provide supporting evidence for warranty or insurance claims

18.

Which material is recommended for making good damage resistance in specific construction scenarios?

a)

Glass (can be brittle under impact)

b)

Rubber (flexible but not always suitable for structural use)

c)

Plaster (non-combustible and offers good resistance)

d)

Foam (lightweight but may lack durability)

19.

Which cable type uses light to transmit data?

a)

Fiber optic

b)

Twisted pair

c)

Coaxial

d)

Shielded copper

20.

What does SWA stand for?

a)

Steel Wire Armoured

b)

Single Wire Arrangement

c)

Shielded Wiring Assembly

d)

Submersible Wiring Application

21.

Which cable insulation type softens with heat?

a)

Braided

b)

Thermoplastic

c)

Silicone rubber

d)

Cross-linked polyethylene (XLPE)

22.

Which cable is most suitable for industrial fixed wiring installations?

a)

Coaxial – commonly used for signal transmission in CCTV systems

b)

MICC – provides excellent fire resistance and is ideal for permanent wiring

c)

Speaker cable – typically used for low voltage audio connections

d)

Ribbon cable – mainly used for internal computer connections

23.

What type of cable is commonly used for high-speed data transmission in modern networks?

a)

Coaxial (used mainly for older TV and broadband connections)

b)

Fibre optic (preferred for fast, reliable data transfer over long distances)

c)

Armoured (typically used for power supply protection, not data transmission)

d)

Ribbon (mainly used for internal computer connections, not for network data transmission)

24.

Which cable is highly flexible and commonly used for portable equipment?

a)

SWA (Steel Wire Armoured) cable, known for its mechanical protection

b)

MICC (Mineral Insulated Copper Clad) cable, suitable for fire-resistant installations

c)

Flexible Cord, designed for frequent movement and portable devices

d)

Coaxial Cable, typically used for signal transmission in communication systems

25.

Modular wiring systems are manufactured:

a)

In remote factories

b)

Off-site

c)

On-site during installation

d)

By specialist electrical engineers

26.

Cable basket is generally used for:

a)

Industrial machinery wiring in hazardous environments

b)

Light to medium cables in commercial installations

c)

Temporary outdoor event power distribution

d)

Direct connection of high-voltage equipment

27.

Ladder racking is mostly used in:

a)

Marine installations

b)

Heavy industrial installations

c)

Commercial office buildings

d)

Domestic wiring systems

28.

Which of the following methods is most effective for reducing electromagnetic interference in cable trays?

a)

Using metallic shielding around cables

b)

Increasing bottom coverage of the tray

c)

Employing twisted pair cables for all installations

d)

Routing power and data cables together for convenience

29.

Spacer bar saddles are used to fix conduit to:

a)

Garden fences

b)

Uneven surfaces

c)

Wooden beams

d)

Metal trunking

e)

Plasterboard walls

30.

What is the space factor?

a)

The total volume of air in a cable tray

b)

The ratio of space occupied by cables in conduit/trunking

c)

The percentage of insulation thickness in a cable run

d)

The allowable number of bends in a conduit system

31.

Do you want your breaks to be decreased and finish times as per expectations (3.45pm)?
If no please select what action you should take to continue class benefits

a)

ensure all trackers and OJT are complete and up to date

b)

No talking when the presentation is taking place

c)

Arrive late, talk to much, turn up from break late and not engage

d)

arrive on time for lesson and from breaks

e)

pay attention during lesson,