wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

T4.2 Feasibility Study

Total questions: 9

Worksheet time: 3mins

Name
Class
Date
1.

What is the primary purpose of preparing a site analysis before design?

a)

To finalize building materials and finishes

b)

To select contractors and construction schedule

c)

To produce marketing visuals for stakeholders

d)

To record and evaluate site and surroundings

2.

Which item must accompany a Planning Permit Application alongside a design response?

a)

A completed Site Analysis document

b)

An as-built services survey

c)

A contractor safety audit report

d)

A post-occupancy evaluation form

3.

When annotating a site analysis plan, which practice best links observations to design thinking?

a)

List only measurements without context

b)

Color-code streets by aesthetic appeal

c)

Sketch perspective views of buildings

d)

Use numbered labels tied to written notes

4.

An architect notes habitable room windows on an abutting property. What is the most appropriate design response consideration?

a)

Prioritize car access at that location

b)

Ignore adjacent openings as off-site

c)

Maximize height near the boundary

d)

Protect privacy and manage overlooking

5.

Which requirement best describes how a design response should originate in a development application?

a)

Be derived from the site analysis

b)

Follow a generic design checklist

c)

Prioritize client aesthetics over context

d)

Replicate nearby projects for consistency

6.

When relating a proposal to adjacent buildings, which action most effectively demonstrates contextual design?

a)

Submit only a massing diagram without scale

b)

Provide correctly proportioned street elevations

c)

Ignore surrounding rooflines and fenestration

d)

Use internal layouts to prove compatibility

7.

You are mapping opportunities and constraints on a site plan. Which step ensures traceability between graphics and written findings?

a)

Number arrows and match each to a description

b)

Color-code elements without a legend

c)

Place notes only in a separate narrative

d)

Rely on memory to connect issues later

8.

Which statement best describes a core characteristic of a feasibility report in architectural projects?

a)

It precedes technical development and implementation

b)

It replaces design development and construction

c)

It finalizes procurement and contractor selection

d)

It follows post‑occupancy evaluation results

9.

A client asks whether to proceed with concept design for a mixed‑use project. Using a feasibility report, which combination of inputs would most credibly support your recommendation?

a)

Render quality, branding style, and brochure layouts

b)

Contractor quotes, site fencing, and safety plans

c)

Historical background, market research, and financial data

d)

Concept sketches, mood boards, and precedent images