NEW
Font size
WorksheetsT4.2 Feasibility Study
Total questions: 9
Worksheet time: 3mins
What is the primary purpose of preparing a site analysis before design?
To finalize building materials and finishes
To select contractors and construction schedule
To produce marketing visuals for stakeholders
To record and evaluate site and surroundings
Which item must accompany a Planning Permit Application alongside a design response?
A completed Site Analysis document
An as-built services survey
A contractor safety audit report
A post-occupancy evaluation form
When annotating a site analysis plan, which practice best links observations to design thinking?
List only measurements without context
Color-code streets by aesthetic appeal
Sketch perspective views of buildings
Use numbered labels tied to written notes
An architect notes habitable room windows on an abutting property. What is the most appropriate design response consideration?
Prioritize car access at that location
Ignore adjacent openings as off-site
Maximize height near the boundary
Protect privacy and manage overlooking
Which requirement best describes how a design response should originate in a development application?
Be derived from the site analysis
Follow a generic design checklist
Prioritize client aesthetics over context
Replicate nearby projects for consistency
When relating a proposal to adjacent buildings, which action most effectively demonstrates contextual design?
Submit only a massing diagram without scale
Provide correctly proportioned street elevations
Ignore surrounding rooflines and fenestration
Use internal layouts to prove compatibility
You are mapping opportunities and constraints on a site plan. Which step ensures traceability between graphics and written findings?
Number arrows and match each to a description
Color-code elements without a legend
Place notes only in a separate narrative
Rely on memory to connect issues later
Which statement best describes a core characteristic of a feasibility report in architectural projects?
It precedes technical development and implementation
It replaces design development and construction
It finalizes procurement and contractor selection
It follows post‑occupancy evaluation results
A client asks whether to proceed with concept design for a mixed‑use project. Using a feasibility report, which combination of inputs would most credibly support your recommendation?
Render quality, branding style, and brochure layouts
Contractor quotes, site fencing, and safety plans
Historical background, market research, and financial data
Concept sketches, mood boards, and precedent images
