Front

What is the purpose of a 'sleeve' in piping?

Back

To prevent pipes from being damaged by contact with concrete

2.

FLASHCARD QUESTION

Front

In plumbing, the lowest point or the lowest inside surface of a channel, conduit, drain, pipe, or sewer pipe is known as the ________.

Back

Invert elevation

3.

FLASHCARD QUESTION

Front

What is the purpose of using rebar in plumbing installations?

Back

To provide protection against movement

4.

FLASHCARD QUESTION

Front

Fill in the blank: When verifying the layout for below-grade piping, you must locate all underground site utility lines. Use grade lines attached to _______ to establish the locations of the drains.

Back

batter boards

5.

FLASHCARD QUESTION

Front

What is the total length of the building drain shown in the house floor plan?

Back

16'-9"

6.

FLASHCARD QUESTION

Front

Fill in the blank: The minimum depth required for the sewer tap from the finished floor of the basement is ___ inches.

Back

41

7.

FLASHCARD QUESTION

Front

What is the importance of maintaining the proper grade in a plumbing system?

Back

It prevents blockages and ensures proper flow.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?