1.
FLASHCARD QUESTION
Front
In a stopwatch time study, adjusting the normal time by an allowence factor for normal delays and interruptions in the:
Back
Standard time
2.
FLASHCARD QUESTION
Front
In work sampling, observations should be taken:
Back
At randomly determined times
3.
FLASHCARD QUESTION
Front
Process chart symbols do not include: Rejection, Delay, Operation, Inspection
Back
Rejection
4.
FLASHCARD QUESTION
Front
A job has a normal time of 12 minutes, a performance rating of .80, and an allowance factor of 20 percent of job time. The standard time for this job in minutes is:
Back
14.4
5.
FLASHCARD QUESTION
Front
In a stopwatch time study, the average time it takes a given worker to perform a task a certain number of times is the:
Back
Observed time
6.
FLASHCARD QUESTION
Front
A simo chart includes: Delay, Storage, Inspection, Left/right hand movements
Back
Left/right hand movements
7.
FLASHCARD QUESTION
Front
Process chart symbols do not include: Inspection, Rejection, Operation, Storage
Back
Rejection
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?