1.

FLASHCARD QUESTION

Front

What is the purpose of site layout?

Back

To organize the construction site for efficient workflow and compliance with regulations.

2.

FLASHCARD QUESTION

Front

Name two tools used in site layout.

Back

Surveying instruments and marking tools.

3.

FLASHCARD QUESTION

Front

What is a building line?

Back

A defined line that indicates the position of a building on a site.

4.

FLASHCARD QUESTION

Front

What are datum pegs used for?

Back

To establish reference points for measurements on a construction site.

5.

FLASHCARD QUESTION

Front

List the roles of the building team members: architect, mason, contractor, engineer, site surveyor.

Back

Architect designs the building; mason constructs with bricks; contractor manages the project; engineer ensures structural integrity; site surveyor measures land.

6.

FLASHCARD QUESTION

Front

What are the types of excavation?

Back

Trench, over-site, and reduced level.

7.

FLASHCARD QUESTION

Front

What are the different types of foundations?

Back

Strip, raft, pad, pile, and stepped foundations.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?