" Listen carefully to the video and find the missing words to the transcript " 

3

4

Dropdown

Flanked ​
two powerful European nations, the English Channel has long been one ​
the world’s most important maritime passages. Yet for most of its history, the channel’s rocky shores and stormy weather made crossing a dangerous prospect.

5

Dropdown

Engineers of the early 1800's proposed numerous plans for spanning the 33 kilometre gap. Their designs included artificial islands linked by bridges, submerged tubes suspended from floating platforms, and an underwater ​
more than twice the length of any existing tunnel.

6

Dropdown

By the end of the century, this last proposal had captured European imagination. The invention of the tunnel boring machine and the discovery of a stable layer of chalk marl below the seabed made this fantastic tunnel more ​
​ .​

7

8

Dropdown

But the project’s most urgent obstacles were ones no engineer could solve.

At the time, Britons viewed their geographic isolation as a strategic advantage,

and fears about French invasion ​
down plans for the tunnel.

9

Dropdown

The rise of aerial warfare rendered these worries obsolete, but new economic concerns arose to replace them. Finally, ​
years after the initial excavation, the two countries reached an agreement, the tunnel would proceed with private funding.

10

Dropdown

In 1985, a group of French and British companies invested the modern equivalent of 14 billion pounds, making the tunnel the ​
expensive infrastructure project to date.

11

Dropdown

The design called for three separate tunnels, one for trains to France, one for trains to England, and one service tunnel between ​
.

12

13

Dropdown

Alongside crossover chambers, emergency passages, and air ducts, this amounted to over 200 kilometres of tunnels. In ​
, workers began excavating from both sides, planning to meet in the middle. Early surveys of the French coast revealed the site was full of fault lines.

14

Dropdown

These small cracks let water seep into the rock, so engineers had to develop waterproof boring machines. The British anticipated drier conditions, and forged ahead with regular borers. But only ​
into the work, water flooded in through undetected fissures.

15

Dropdown

To drill in this wet chalk, the British had to use grout to seal the cracks created in the borer’s wake, and even work ahead ​
main borer to reinforce the chalk about to be drilled.

16

Dropdown

With these obstacles behind them, both teams began drilling at full speed.

Boring machines ​
up to 1,300 tons drilled at nearly 3.5 meters per hour.

17

18

Dropdown

As they dug, they installed lining rings to stabilise the tunnel behind them, making way for support wagons following each machine. ​
at top speed, work had to proceed carefully.

19

Dropdown

The chalk layer followed a winding path between unstable rock and clay, punctured by over 100 boring holes made by previous surveyors. Furthermore, both teams had to constantly check their coordinates to ensure they were on track to meet within ​
centimetres of each other.

20

Dropdown

To maintain this delicate trajectory, the borers employed satellite positioning systems, as well as palaeontologists who used excavated fossils to confirm they were at the right depth. During ​
, the project employed over 13,000 people and cost the lives of ten workers.

21

Dropdown

But after two and a half years of ​
, the two sides finally made contact. British worker Graham Fagg emerged on the French side, becoming the first human to cross the channel by land since the Ice Age.

22

23

Dropdown

There was still work to be done, from installing crossover chambers and ​
stations, too laying over a hundred miles of tracks, cables, and sensors. But on May 6, 1994, an opening ceremony marked the tunnel’s completion.

24

Dropdown

Full public service began 16 months later, with trains for passengers and rail ​
for cars and trucks. Today, the Channel Tunnel services over 20 million passengers a year, transporting riders across the channel in just 35 minutes.

25

Dropdown

Unfortunately, not everyone has the privilege of making this trip legally. Thousands of refugees have tried to enter ​
through the tunnel in sometimes fatal attempts.

26

Dropdown

These tragedies have transformed the tunnel’s southern entrance into an ongoing site of conflict. Hopefully, the structure’s history ​
serve as a reminder that humanity is at their best when breaking down barriers.

27

"Now answer the questions about what you read about " 

28

Fill in the Blanks

Type answer...

29

Fill in the Blanks

Type answer...

30

Fill in the Blanks

Type answer...

31

Fill in the Blanks

Type answer...

32

Fill in the Blanks

Type answer...

33

Fill in the Blanks

Type answer...

34

Fill in the Blanks

Type answer...

35

Fill in the Blanks

Type answer...

36

Fill in the Blanks

Type answer...

37

Fill in the Blanks

Type answer...

38

Fill in the Blanks

Type answer...

How the world's longest underwater tunnel was built 

Lesson created by Simply English

Show answer

Auto Play

Slide 1 / 38

SLIDE