Search Header Logo
Lean Six Sigma IRTC

Lean Six Sigma IRTC

Assessment

Presentation

Professional Development

Professional Development

Medium

Created by

Minh Hoàng

Used 4+ times

FREE Resource

14 Slides • 26 Questions

1

Lean Six Sigma Greenbelt Class Closure

2

media

Arrange steps to correct the phase of DMAIC.

Activity 1

media

3

media

Theo bạn điều gì quan trọng sau khoá học này để giúp bạn hiểu hơn và ứng dụng được Lean Six Sigma

Activity 2

4

Open Ended

Theo bạn điều gì quan trọng sau khoá học này để giúp bạn hiểu hơn và ứng dụng được Lean Six Sigma

5

media

Self-learning is an approach to learning where the individual makes the effort to identify their own learning needs, set learning goals, find the necessary resources, and evaluate their own knowledge. 

Soure: Creatly

Self-learning

6

media
media
media

Curiosity is the key to unlocking your independent learning habit. You can only engage with the process of self-teaching and learning by having a curiosity to explore new areas of interest and a desire to develop your knowledge base and skill set.

Feed your curiosity

​The way you approach your learning may differ significantly depending on your objectives. If you aim to gain a skill that you can apply to your career or workplace, your approach is going to differ from learning simply to feed your curiosity and broaden your general knowledge.

Define your learning objectives

​The internet has a wealth of educational websites and apps that could help you study an academic or theory-driven subject. Video platforms, blogs and other online content can also help you study and advance practical skills.

Assess the available resources

Tips for effective self-learning

​Source: Indeed

7

media
media
media

​Create a schedule for your learning sessions and try your best to stick to it, as regular learning can help you embed and retain information. Likewise, make sure your learning environment, such as your desk or study, enables you to focus and shut out distractions.

Learning schedule and environment

If you're learning a new practical skill, give yourself the time and resources to improve, make mistakes and learn through doing. If you're building your knowledge or skills base for work, find opportunities to put it into practice in your day-to-day work, or start applying for roles that list your new skills in the job description.

Apply what you've learned

Search for online communities for the subject you're studying. You're likely to find plenty of other people who are learning about or interested in the same subjects as you. These communities can be ideal to test your knowledge and further your learning through collaboration with others.

Connect with others

Tips for effective self-learning

8

media
media

Coursera

Udemy

Linkedin Learning

Alison

Khan Academy

​​MOOC

Mọi người đều nói dối.

Hướng dẫn triển khai Lean Six Sigma.

Tư duy tinh gọn

Suy nghĩ thống kê

Thống kê trong kinh tế và kinh doanh.

Storytelling with data.

Nghệ thuật tư duy dựa trên dữ liệu

Books

9

media

​Draw Lean House

Activity 3

10

media
media
media
media
media
media

4

House of Lean

11

​Play a quiz. The 2 winners can get the gift.

Activity 3

media

12

Multiple Choice

In a normally distributed process, what percentage of measurements will fall within the range of ± 3.0 sigma ?

1

99.99966%

2

99.73%

3

0.00135

4

It depends on the application of the Central Limit Theorem

13

Multiple Choice

Which of the following lists are elements of the Lean Six Sigma SIPOC diagram?

1

Statistics > Improvement > Process > Organization > Control

2

Supplier > Input > Process > Output > Customer

3

Service > IT > Purchasing > Operations > CEO

4

Sigma > Improvement > Planning > Optimizing > Categorizing

14

Multiple Choice

Project team members go through a progression of four stages during a project. What are they?

1

Forming > Storming > Norming > Performing

2

Planning > Doing > Checking > Acting

3

Defining > Measuring > Analyzing > Improving

4

Destroying > Sorting > Verifying > Re-building

15

Multiple Choice

A full factorial design is said to be a 32 experiment. What does this mean?

1

Two dependent variables and three independent variables.

2

Two factors of three levels.

3

Three levels of two factors.

4

Three factors with 2 colinear variables.

16

Multiple Choice

Which of the statements below is NOT a Type 1 error?

1

An error results when a null hypothesis is rejected when it should be true

2

An error results when a null hypothesis is not rejected when it should be rejected

17

Multiple Choice

COPQ does not include:

1

Extra material costs

2

Rework cost

3

Disposition costs

4

Prevention cost

18

Multiple Choice

What does 'O' in D.O.W.N.T.I.M.E stands for?

1

Override

2

Oh No!

3

Overproduction

4

Offset

19

Multiple Choice

Which definition below show the accurate one for Inventory (I) in D.O.W.N.T.I.M.E?

1

Excess products and materials

not being processed

2

Unnecessary movements of products and materials

20

Multiple Choice

______ is a document that provides a framework and objective for a lean six sigma improvement project.

1

Project Charter

2

Goal Statement

3

Project Scope

4

Problem Statement

21

Multiple Choice

"I don't like cold pizzas" is an example of ______________

1

Voice of Process (VOP)

2

Process Input

3

Problem Statement

4

Voice of Customer (VOC)

22

Multiple Choice

To determine which product accounts for the majority of defects, use a __________.

1

Histogram

2

Box Plot

3

Pareto Chart

4

Scatter Plot

23

Multiple Choice

What Process Metric is the 'Rate of Customer Demand'?

1

Takt Rate

2

Throughput Rate

3

Cycle Time

4

Work In Progress Time

24

Multiple Choice

Pilot testing of solutions are carried out during the Improve phase.

1

True

2

False

25

Multiple Choice

A key deliverable of the Control Phase is ___________

1

Impact Difficulty Matrix

2

Process Control Plan

3

Project Stakeholder Analysis

4

The Mean, VOC & VOP

26

Multiple Choice

Inspectors at an auto parts company sample wheel rims and measure the diameter of each rim. Every 2 hours, they sample 5 consecutive wheel rims from the production line. Which chart can you use ?

1

X bar - R

2

P chart

3

X bar - S

27

Multiple Choice

Any Project initiation will begin with a

1

Gate review

2

Introduction session

3

Weekly meeting

4

Kick Off meeting

28

Multiple Choice

Small/Mid-sized Six Sigma projects are executed by professionals titled as

1

Champion

2

Green Belt

3

Black Belt

4

Yellow Belt

29

Multiple Choice

Six Sigma is applicable to

1

Finance

2

Supply chain

3

Healthcare

4

All of the above

30

Multiple Choice

Quality engineers want to determine whether paint hardness differs depending on the paint blend. They treat several metal test samples with one of four paint blends and then measure the hardness for each blend to determine whether the means differ.

1

One - way ANOVA

2

Two-way ANOVA

3

2 sample-t

31

Multiple Choice

“DMAIC” is used for projects aimed at

1

improving an existing business process

2

creating new product or process designs

3

Both (A) and (B)

4

None of the above

32

Multiple Choice

A manufacturer of particle board wants to examine whether the density of the particles is associated with the stiffness of the board. Which types of regression can you use ?

1

Simple Regression

2

Multiple Regression

33

Multiple Choice

Kaizen is

1

a Japanese word which means "create"

2

a Japanese word which means "productivity"

3

a Japanese word which means "collaborate"

4

Japanese term for "continuous improvement"

34

Multiple Choice

Any time spent on something that adds nothing to your product or life

1

Non-Value Added

2

Transformation of thinking

3

TQM

4

Innovation

35

Multiple Choice

Six sigma called data driven processes improvement, because?

1

Are heavily based on intuition and perception

2

Rely heavily on the experience of the process owners

3

Are based on statistical data, measurement and metrics

4

Rely on experience

36

Multiple Choice

Operator waiting material from vendor, categorized as waste of?

1

Over production

2

Transportation

3

Waiting

4

Non utilize employee

37

Replace this with a header

Replace this with your body text. Duplicate this text as many times as you would like. All provided templates can be reused multiple times. Wish you a good day.

Happy teaching!

38

Alvin Toffler

“The illiterate of the 21st century will not be those who cannot read and write, but those who cannot learn, unlearn, and relearn.”

39

Benjamin Franklin

“Tell me and I forget, teach me and I may remember, involve me and I learn.”

40

Albert Einstein

“Wisdom is not a product of schooling but of the lifelong attempt to acquire it.”

Lean Six Sigma Greenbelt Class Closure

Show answer

Auto Play

Slide 1 / 40

SLIDE

Discover more resources for Professional Development