Search Header Logo
​Unit 306  Self study 1 Roles of the construction team

​Unit 306 Self study 1 Roles of the construction team

Assessment

Presentation

Other

12th Grade

Easy

Created by

Plumbers Cymoedd

Used 3+ times

FREE Resource

2 Slides • 32 Questions

1

​Unit 306
Self study 1
Roles of the construction team

media

2

​Click on the following link to open the text:

Unit 306 P1 Roles in the construction team.pdf


then use the text to answer the questions that follow.

3

Multiple Choice

What is the primary focus of the construction team within the plumbing and heating industry?

1

Designing new plumbing systems

2

Working together to produce what the client has requested

3

Installing heating equipment

4

Conducting market research

4

Multiple Choice

What is the purpose of the site management team in a construction project?

1

To design the building

2

To follow a recognized structure for operation and communication

3

To purchase materials

4

To conduct safety inspections

5

Multiple Choice

What is essential for all members within the management structure to ensure the smooth running of a construction project?

1

Knowing their roles and responsibilities

2

Having a flexible schedule

3

Working independently

4

Avoiding communication

6

Multiple Choice

What are the two tiers of management in large construction sites?

1

Those who work remotely and those who work on-site

2

Those who visit occasionally and those permanently site-based

3

Those who manage finances and those who manage labor

4

Those who design and those who build

7

Multiple Choice

Who is considered the most important part of a construction project?

1

The architect

2

The client

3

The contractor

4

The engineer

8

Multiple Choice

What is one of the responsibilities of clients under the Construction (Design and Management) Regulations 2015?

1

Designing the building

2

Financing the project

3

Ensuring the competence of all team members

4

Supervising the construction work

9

Multiple Choice

What must clients do for projects lasting more than 30 days or involving 500 person-days of construction work?

1

Hire more workers

2

Appoint a principal designer and contractor

3

Reduce the project scope

4

Increase the budget

10

Multiple Choice

What is the role of the architect in a construction project?

1

Financing the project

2

Supervising all aspects of the construction work

3

Hiring construction workers

4

Managing the project's budget

11

Multiple Choice

What is the primary role of a building surveyor?

1

To design the roads in and out of the building

2

To ensure building regulations are followed during construction

3

To calculate the cost of building materials

4

To manage the heating and ventilation systems

12

Multiple Choice

What document is used by building contractors to produce an estimate?

1

Bill of Rights

2

Bill of Materials

3

Bill of Quantities

4

Bill of Construction

13

Multiple Choice

Which type of engineer is responsible for designing the internal services within a building?

1

Civil engineer

2

Structural engineer

3

Building services engineer

4

Mechanical engineer

14

Multiple Choice

What is one of the responsibilities of a quantity surveyor (QS)?

1

Designing the building's structure

2

Ensuring compliance with safety regulations

3

Advising on the cost of any variations to the original contract

4

Managing the construction workforce

15

Multiple Choice

Which specialist engineer is involved in the design of drainage and water requirements?

1

Civil engineer

2

Structural engineer

3

Building services engineer

4

Electrical engineer

16

Multiple Choice

What is the primary role of the clerk of works (CoW) on a construction site?

1

Ensuring the building is constructed according to drawings and maintaining quality.

2

Designing the architectural plans for the building.

3

Managing the financial aspects of the construction project.

4

Hiring and supervising construction workers.

17

Multiple Choice

Who is responsible for processing planning applications and advising on planning issues?

1

Building control officer

2

Planning officer

3

Clerk of works

4

Construction manager

18

Multiple Choice

What is one of the responsibilities of a building control officer?

1

Designing the building's architecture

2

Ensuring regulations connected with public health and safety are met

3

Managing the construction budget

4

Hiring construction workers

19

Multiple Choice

What is the primary responsibility of the estimator in the construction industry?

1

Supervising the creation and management of contracts

2

Breaking down the Bill of Quantities into labor, materials, and plant

3

Sourcing and purchasing all the materials needed

4

Accountable for all health and safety aspects on-site

20

Multiple Choice

Who is responsible for sourcing and purchasing all the materials needed in construction?

1

The estimator

2

The buyer

3

The safety officer

4

The plant manager

21

Multiple Choice

What is the role of the planning engineer in the construction industry?

1

Supervising the creation and management of contracts

2

Responsible for pre-contract planning and identifying efficient use of resources

3

Accountable for all health and safety aspects on-site

4

Responsible for sourcing and purchasing materials

22

Multiple Choice

Who is accountable for all health and safety aspects on-site?

1

The estimator

2

The buyer

3

The safety officer

4

The contracts manager

23

Multiple Choice

What is the main responsibility of the site supervisor?

1

Breaking down the Bill of Quantities

2

Sourcing and purchasing materials

3

Overseeing the day-to-day running of the site

4

Supervising the creation and management of contracts

24

Multiple Choice

Which of the following is a task performed by craft operatives on a construction site?

1

Overseeing the work of the workforce

2

Constructing the building to the architect’s specifications

3

Holding discussions with workers to resolve grievances

4

Maintaining attendance records and rosters

25

Multiple Choice

What are the two main groups of on-site trades mentioned in the document?

1

Supervisors and Managers

2

Engineers and Architects

3

Craft operatives and Building operatives

4

Designers and Planners

26

Multiple Choice

What are the three key functions performed by plumbers on domestic construction sites?

1

Hot and cold water supplies, central heating, gas

2

Electrical wiring, painting, tiling

3

Air conditioning, plastering, decorating

4

Landscaping, roofing, flooring

27

Multiple Choice

Which trade is responsible for installing and testing all electrical installations on-site?

1

Electricians

2

Plumbers

3

Carpenters

4

Painters

28

Multiple Choice

What is the main responsibility of heating and ventilation/air conditioning engineers?

1

Installing large diameter pipework for heating systems and air conditioning ductwork

2

Painting and decorating walls

3

Installing natural gas lines

4

Laying floor tiles

29

Multiple Choice

Who are responsible for wall and ceiling finishing, including painting and decorating?

1

Painters and decorators

2

Plumbers

3

Electricians

4

Gas fitters

30

Multiple Choice

Which type of inspector is also known as the 'factory inspector'?

1

Health and safety inspector

2

Building control inspector

3

Water inspector

4

Electrical services inspector

31

Multiple Choice

Who employs water inspectors?

1

Local authority

2

Local water undertaker

3

Electrical supply company

4

Building contractor

32

Multiple Choice

What must all visitors do when visiting a construction site?

1

Sign in, undergo a health and safety induction, wear proper attire

2

Only sign in and wear proper attire

3

Undergo a health and safety induction and leave immediately

4

Wear proper attire and leave immediately

33

Multiple Choice

What is the purpose of a job specification document on a construction site?

1

To describe the installation being quoted for, including materials and appliances

2

To provide a list of all workers on site

3

To outline the daily schedule of construction activities

4

To detail the financial budget for the project

34

Multiple Choice

What do working drawings need to show according to the text?

1

All dimensions and be properly scaled

2

Only the exterior design of the building

3

The financial budget for the project

4

The list of materials to be used

​Unit 306
Self study 1
Roles of the construction team

media

Show answer

Auto Play

Slide 1 / 34

SLIDE