Task 6 Setting out
Presentation
•
Construction
•
Vocational training
•
Practice Problem
•
Medium
Colin Barron
Used 1+ times
FREE Resource
18 Slides • 15 Questions
1
2
3
Open Ended
How might the ability to measure angles with a protractor be useful in real-world applications beyond drawing?
4
5
Multiple Choice
Which of the following is NOT typically included as an underground service?
Water pipe
Gas pipe
Electrical cable
Telephone pole
6
7
Open Ended
Explain why site clearance is an important step before construction work begins.
8
9
10
Fill in the Blanks
The building line is established by the
Type answer...
11
Multiple Select
Which of the following statements about building and frontage lines are correct?
The building line is established by the architect and client.
No construction can be built over the frontage line.
The frontage line represents the back edge of the building plot.
The building line is shown on the drawings.
12
13
Open Ended
Describe the potential consequences of inaccurate right angle setting during construction.
14
15
Multiple Select
Which of the following methods can be used to check that a build is at a right angle?
3:4:5 method
Builders square
Optical square
Spirit level
16
17
18
Multiple Select
Which of the following are essential steps in setting out a basic building?
Transferring levels
Checking diagonals
Removing topsoil
Indicating wall and trench positions on profiles
19
Multiple Choice
What is the main reason for removing the topsoil during site clearance before starting construction?
It contains a high content of vegetable matter, making it unsuitable for building.
It is too hard to dig through.
It is required for landscaping.
It prevents water drainage.
20
21
22
Fill in the Blanks
The common method used in construction to check if a corner is square is the
Type answer...
23
Open Ended
Explain how diagonal measurements are used to ensure a building is square during the setting out process.
24
25
26
27
Multiple Choice
Which of the following is indicated by the centre line in the process of setting out a building foundation?
The midpoint of the foundation width
The location for marking soil
The position of the datum peg
The end bearing of a lintel
28
29
Open Ended
Explain why coloured spray paint or soft sand is used when marking soil during the setting out of buildings.
30
31
Multiple Select
Which of the following steps are necessary to ensure accuracy when transferring levels between pegs?
Marking only alternate pegs
Reversing both straight edge and level each time
Using a datum peg
Ensuring lintel is fully bedded on mortar
32
33
Fill in the Blanks
Ensure lintel is fully bedded on
Type answer...
Show answer
Auto Play
Slide 1 / 33
SLIDE
Similar Resources on Wayground
27 questions
Present Simple - FUNDEIM
Presentation
•
KG
27 questions
Economia azul
Presentation
•
KG
25 questions
VOCABULARY TOPIC 3-SHAPE
Presentation
•
KG
25 questions
Physical and Chemical Changes Review
Presentation
•
8th Grade
27 questions
Grammar Review- 3rd Grade, Unit 3, Lesson 12
Presentation
•
KG
24 questions
AY21/22 Primary Coaching Resource 2 : Familiarity Ops
Presentation
•
Professional Development
29 questions
Pedigree Lesson 2022
Presentation
•
7th - 10th Grade
Popular Resources on Wayground
10 questions
Safety Day 2026 – Student Review
Quiz
•
9th Grade
21 questions
Continents and Oceans
Quiz
•
6th Grade
20 questions
Parts of Speech
Quiz
•
5th Grade
16 questions
Subject & Predicate
Quiz
•
5th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
12 questions
Map Skills
Quiz
•
3rd Grade
22 questions
Continents and Oceans
Quiz
•
5th Grade
15 questions
Rounding Decimals
Quiz
•
5th Grade