
Task 6 Setting out
Presentation
•
Construction
•
Vocational training
•
Practice Problem
•
Medium
Colin Barron
Used 1+ times
FREE Resource
18 Slides • 15 Questions
1
2
3
Open Ended
How might the ability to measure angles with a protractor be useful in real-world applications beyond drawing?
4
5
Multiple Choice
Which of the following is NOT typically included as an underground service?
Water pipe
Gas pipe
Electrical cable
Telephone pole
6
7
Open Ended
Explain why site clearance is an important step before construction work begins.
8
9
10
Fill in the Blanks
Type answer...
11
Multiple Select
Which of the following statements about building and frontage lines are correct?
The building line is established by the architect and client.
No construction can be built over the frontage line.
The frontage line represents the back edge of the building plot.
The building line is shown on the drawings.
12
13
Open Ended
Describe the potential consequences of inaccurate right angle setting during construction.
14
15
Multiple Select
Which of the following methods can be used to check that a build is at a right angle?
3:4:5 method
Builders square
Optical square
Spirit level
16
17
18
Multiple Select
Which of the following are essential steps in setting out a basic building?
Transferring levels
Checking diagonals
Removing topsoil
Indicating wall and trench positions on profiles
19
Multiple Choice
What is the main reason for removing the topsoil during site clearance before starting construction?
It contains a high content of vegetable matter, making it unsuitable for building.
It is too hard to dig through.
It is required for landscaping.
It prevents water drainage.
20
21
22
Fill in the Blanks
Type answer...
23
Open Ended
Explain how diagonal measurements are used to ensure a building is square during the setting out process.
24
25
26
27
Multiple Choice
Which of the following is indicated by the centre line in the process of setting out a building foundation?
The midpoint of the foundation width
The location for marking soil
The position of the datum peg
The end bearing of a lintel
28
29
Open Ended
Explain why coloured spray paint or soft sand is used when marking soil during the setting out of buildings.
30
31
Multiple Select
Which of the following steps are necessary to ensure accuracy when transferring levels between pegs?
Marking only alternate pegs
Reversing both straight edge and level each time
Using a datum peg
Ensuring lintel is fully bedded on mortar
32
33
Fill in the Blanks
Type answer...
Show answer
Auto Play
Slide 1 / 33
SLIDE
Similar Resources on Wayground
26 questions
Untitled Lesson
Presentation
•
KG
25 questions
Introduction of Set Form 1
Presentation
•
KG
25 questions
Possessive adj
Presentation
•
KG
26 questions
Electric and electronic devices
Presentation
•
KG
26 questions
Cyber safety from strangers
Presentation
•
KG
26 questions
Frequently asked questions
Presentation
•
KG
26 questions
Developing Sensory and Fine Motor Skills
Presentation
•
KG
26 questions
K2 unit 4 Lesson 1
Presentation
•
KG
Popular Resources on Wayground
10 questions
GPA Lesson
Presentation
•
9th - 12th Grade
7 questions
Albert Einstein
Quiz
•
3rd Grade
31 questions
Bridge A Review
Quiz
•
3rd Grade
6 questions
Blue Sue and Red Ruth
Quiz
•
3rd Grade
8 questions
(Day12 HW) Inverse Trig Ratios
Quiz
•
9th Grade
20 questions
Summer Geometry QUIZ (Week3)
Quiz
•
9th Grade
16 questions
Theme Practice
Quiz
•
7th Grade
20 questions
Taxes
Quiz
•
9th - 12th Grade