Search Header Logo

unit 501-S5

Other

University

Used 7+ times

unit 501-S5
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which method of installing a cable in a building void is permitted?

without fixings
WITH FIXING 

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which area is regarded as a medical location in the Saudi Building regulations?

Treatment room
CARAVAN 

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What is the requirement for a motor installed in an area where there are stored materials which pose a risk?

Motors must be placed outside this area
motor must be protected against excessive temperature rise

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What is classified as a hazardous location in Saudi Building regulations?

an area where there are explosive gas present
bed room 
caravan 

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which requirement applies to a construction site where there is more than onesource of supply?

equipment must be identified for use of one particular supply
do not use both  in the same time 

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What is the minimum IP rating of electrical equipment installed in Zone 2 of anindoor swimming pool?

IPX2
IPX4
IP66
IP56

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Where can underground cables without additional protection be used in acaravan park?

outside the area of a caravan pitch
INSIDE THE CARAVAN 

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?