Hot water revision level 2

Hot water revision level 2

Professional Development

31 Qs

quiz-placeholder

Similar activities

Water Conservation Awareness Quiz

Water Conservation Awareness Quiz

Professional Development

30 Qs

Brake Fundamentals

Brake Fundamentals

Professional Development

26 Qs

Fire Suppression

Fire Suppression

Professional Development

30 Qs

SISTEM PENDINGIN KENDARAAN RINGAN

SISTEM PENDINGIN KENDARAAN RINGAN

Professional Development

33 Qs

central heating 1

central heating 1

Professional Development

28 Qs

Gen_Tech_FoP_Quiz2

Gen_Tech_FoP_Quiz2

12th Grade - Professional Development

30 Qs

Water Distribution 1-3

Water Distribution 1-3

Professional Development

30 Qs

Hot water revision level 2

Hot water revision level 2

Assessment

Quiz

Other

Professional Development

Medium

Used 94+ times

FREE Resource

31 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The recommended minimum diameter for gravity circulation pipework, between the boiler and hot water storage cylinder in a direct hot water system, is

22mm

15mm

28mm

35mm

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The minimum capacity recommended by British Standard 6700 for a cold water storage cistern, that is feeding all outlets in a dwelling (both hot and cold) is

380 litres

450 litres

400 litres

200 litres

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of service valve is usually fitted to the cold feed pipe to a hot water storage cylinder?

Spherical plug valve.

Full way gate valve.

Non-return valve

Supply stop valve

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following plastic pipe materials is usually used for domestic hot and cold supply and distribution water pipework?

Acrylonitrile Butadiene Styrene (ABS).

Polypropylene copolymer (PP)

Polybutylene

Unplasticised polyvinyl chloride (PVC – U).

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following should be positioned in either the bottom of the hot water storage cylinder, or in the cold feed pipe to the storage cylinder?

Media Image
Media Image
Media Image
Media Image

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Hydraulic test procedures for rigid pipework systems routinely requires a standing period to

Allow the water in the system to get into any dead ends of pipework

.

Allow all air within the system to reach the highest point within the system

Permit the indicator needle on the test equipment pressure gauge to settle down

Allow all water and pipework to reach the ambient temperature

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following requires that domestic hot water systems have insulated components?

British Standard 5440.

Building Regulations.

Construction Regulations.

Control of Substances Hazardous to Health Regulations

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?