Hot water revision level 2

Quiz
•
Other
•
Professional Development
•
Medium
Used 94+ times
FREE Resource
31 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The recommended minimum diameter for gravity circulation pipework, between the boiler and hot water storage cylinder in a direct hot water system, is
22mm
15mm
28mm
35mm
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The minimum capacity recommended by British Standard 6700 for a cold water storage cistern, that is feeding all outlets in a dwelling (both hot and cold) is
380 litres
450 litres
400 litres
200 litres
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of service valve is usually fitted to the cold feed pipe to a hot water storage cylinder?
Spherical plug valve.
Full way gate valve.
Non-return valve
Supply stop valve
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of the following plastic pipe materials is usually used for domestic hot and cold supply and distribution water pipework?
Acrylonitrile Butadiene Styrene (ABS).
Polypropylene copolymer (PP)
Polybutylene
Unplasticised polyvinyl chloride (PVC – U).
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of the following should be positioned in either the bottom of the hot water storage cylinder, or in the cold feed pipe to the storage cylinder?
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Hydraulic test procedures for rigid pipework systems routinely requires a standing period to
Allow the water in the system to get into any dead ends of pipework
.
Allow all air within the system to reach the highest point within the system
Permit the indicator needle on the test equipment pressure gauge to settle down
Allow all water and pipework to reach the ambient temperature
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of the following requires that domestic hot water systems have insulated components?
British Standard 5440.
Building Regulations.
Construction Regulations.
Control of Substances Hazardous to Health Regulations
Create a free account and access millions of resources
Similar Resources on Wayground
30 questions
Above ground drainage

Quiz
•
9th Grade - Professio...
26 questions
Random Plumbing 01

Quiz
•
Professional Development
30 questions
Phase 2 Multiple Choice Test A

Quiz
•
Professional Development
30 questions
HVAC State Test Prep 11

Quiz
•
Professional Development
35 questions
HVAC State Test Prep 08

Quiz
•
Professional Development
30 questions
L3 YR2 Revision 1 (Cold 1)

Quiz
•
Professional Development
30 questions
Unit 309 Heating end of unit revision

Quiz
•
Professional Development
30 questions
Phase 2 Multiple Choice Test C

Quiz
•
Professional Development
Popular Resources on Wayground
18 questions
Writing Launch Day 1

Lesson
•
3rd Grade
11 questions
Hallway & Bathroom Expectations

Quiz
•
6th - 8th Grade
11 questions
Standard Response Protocol

Quiz
•
6th - 8th Grade
40 questions
Algebra Review Topics

Quiz
•
9th - 12th Grade
4 questions
Exit Ticket 7/29

Quiz
•
8th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
19 questions
Handbook Overview

Lesson
•
9th - 12th Grade
20 questions
Subject-Verb Agreement

Quiz
•
9th Grade