Hot water revision level 2

Hot water revision level 2

Professional Development

31 Qs

quiz-placeholder

Similar activities

Seleksi Peserta Pelatihan Pembuatan Roti dan Kue

Seleksi Peserta Pelatihan Pembuatan Roti dan Kue

Professional Development

30 Qs

Trivial de pel·lícules

Trivial de pel·lícules

Professional Development

27 Qs

Guess the rapper

Guess the rapper

KG - Professional Development

28 Qs

400th Prakash Purab of Guru Teg Bahadur Sahib Ji

400th Prakash Purab of Guru Teg Bahadur Sahib Ji

KG - Professional Development

30 Qs

MHA Quiz

MHA Quiz

KG - Professional Development

26 Qs

Mid term study guide

Mid term study guide

5th Grade - Professional Development

26 Qs

harry potter quiz

harry potter quiz

3rd Grade - Professional Development

26 Qs

IMS Awareness - Series 3 - Online Quiz (23rd March 20)

IMS Awareness - Series 3 - Online Quiz (23rd March 20)

Professional Development

26 Qs

Hot water revision level 2

Hot water revision level 2

Assessment

Quiz

Other

Professional Development

Medium

Used 96+ times

FREE Resource

31 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The recommended minimum diameter for gravity circulation pipework, between the boiler and hot water storage cylinder in a direct hot water system, is

22mm

15mm

28mm

35mm

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The minimum capacity recommended by British Standard 6700 for a cold water storage cistern, that is feeding all outlets in a dwelling (both hot and cold) is

380 litres

450 litres

400 litres

200 litres

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of service valve is usually fitted to the cold feed pipe to a hot water storage cylinder?

Spherical plug valve.

Full way gate valve.

Non-return valve

Supply stop valve

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following plastic pipe materials is usually used for domestic hot and cold supply and distribution water pipework?

Acrylonitrile Butadiene Styrene (ABS).

Polypropylene copolymer (PP)

Polybutylene

Unplasticised polyvinyl chloride (PVC – U).

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following should be positioned in either the bottom of the hot water storage cylinder, or in the cold feed pipe to the storage cylinder?

Media Image
Media Image
Media Image
Media Image

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Hydraulic test procedures for rigid pipework systems routinely requires a standing period to

Allow the water in the system to get into any dead ends of pipework

.

Allow all air within the system to reach the highest point within the system

Permit the indicator needle on the test equipment pressure gauge to settle down

Allow all water and pipework to reach the ambient temperature

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following requires that domestic hot water systems have insulated components?

British Standard 5440.

Building Regulations.

Construction Regulations.

Control of Substances Hazardous to Health Regulations

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?