Constructions C

Constructions C

Professional Development

39 Qs

quiz-placeholder

Similar activities

Solar Math - Revisited - 03312025

Solar Math - Revisited - 03312025

Professional Development

37 Qs

#JoyFE

#JoyFE

University - Professional Development

34 Qs

human

human

Professional Development

40 Qs

Trucks

Trucks

1st Grade - Professional Development

40 Qs

Local Government Quiz - ZDS

Local Government Quiz - ZDS

Professional Development

39 Qs

Aptitude

Aptitude

Professional Development

40 Qs

MGNF Practice - 50

MGNF Practice - 50

University - Professional Development

40 Qs

Functions- Unit 1

Functions- Unit 1

10th Grade - Professional Development

35 Qs

Constructions C

Constructions C

Assessment

Quiz

Mathematics, Physics

Professional Development

Medium

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

39 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Soils with little to no shear resistance to sliding are considered

Frictional

Plastic

Cohesive

Stable

[ANSWER TBD]

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

The Michigan Energy code required R-value for Below Grade Walls is?

R5

R7.5

R10

No Requirement

[ANSWER TBD]

3.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

A sealant that is listed as +100/-50% can perform as follows?

extend 50% of installed width, compress 100% of installed width

compress 50% of installed width, extend 100% of installed width

compress 50-100% of installed width, extend 50-100% of installed width

None of the Above

4.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Backer rods are used in the installation of sealant joints to?

I. provide a secondary waterproof layer

II. Control the depth of the sealant

III. prevent three-sided adhesion

IV. aide in sealant tooling

V. attain proper sealant joint profile

II and III

II only

II, III, IV, V

I, II, III, IV, V

[ANSWER TBD]

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

A sealant installed near the lowest temperature will generally always experience compression of the joint width and sealant

True

False

[ANSWER TBD]

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Cohesive sealant failures are often caused by installing the sealant too thick.

True

False

[ANSWER TBD]

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Clay is often considered to be stable and, therefore, predictable and good support for buildings.

True

False

[ANSWER TBD]

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?