1.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

An engineer must design a control panel for a wind turbine, given the following guidelines:

o Two warning lamps (L1 & L2) turn on when the turbine speed exceeds 5000 rpm (S1)

o If the current through either lamp is stopped (lamp burns out) the other lamp must still be able to illuminate

o The total current must not exceed 0.50 A

Which design satisfies all of the engineer’s design criteria?

Media Image
Media Image
Media Image

2.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Three students are designing a winch system. As part of the design process they find existing solutions, and identify why the solutions are not adequate or appropriate. Which step of the design process are the students completing?

Research & define the problem

Evaluate a Solution

Develop a Solution

Present Testing Results

3.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

Media Image

A design team completed the above decision matrix to evaluate their ideas.

Which idea should the team pick as a solution based solely on the decision matrix? Idea #2, since it has the lowest cost

Idea #2, since it has the lowest cost

Idea #4, since it has the least complex idea

Idea #3, since it has the highest decision matrix total

Idea #6, since it ranks highest on the decision matrix summary

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

What type of simple machine is the shovel?

1st Class Lever

2nd Class Lever

3rd Class Lever

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which resource is a form of renewable energy?

Biomass

Coal

Natural Gas

Uranium

6.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Which ammeter will display the highest current?

Media Image
Media Image
Media Image
Media Image

7.

MULTIPLE CHOICE QUESTION

3 mins • 1 pt

A team of engineers has been assembled to design and create a renewable electrical energy generating and distribution system that utilizes wind, solar-electric, and fuel-cell energy conversion systems. The team just finished creating a decision matrix to compare the attributes of the various ideas. Which step from the design process is now occurring?

Evaluate solution

Generate Concepts

Develop a solution

Construct & test prototype

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email