ATD GCOR Quiz 4

ATD GCOR Quiz 4

Professional Development

10 Qs

quiz-placeholder

Similar activities

Cepat Tepat

Cepat Tepat

Professional Development

15 Qs

ATD GCOR Quiz 13

ATD GCOR Quiz 13

Professional Development

10 Qs

Integración Field SCM

Integración Field SCM

Professional Development

11 Qs

Adidas Sportswear

Adidas Sportswear

Professional Development

10 Qs

Commercial 2022 Priorities

Commercial 2022 Priorities

Professional Development

11 Qs

Static Routing

Static Routing

Professional Development

15 Qs

Competency 3 Vocabulary

Competency 3 Vocabulary

Professional Development

10 Qs

Introduction to Routing

Introduction to Routing

Professional Development

15 Qs

ATD GCOR Quiz 4

ATD GCOR Quiz 4

Assessment

Quiz

Professional Development

Professional Development

Easy

Created by

WATC Staff

Used 131+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

23.1 - 8.3

In TWC territory, may a main track switch be left open in non-signaled TWC territory?

Yes

No

Yes, but only with track warrant authority

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

23.1 - 8.3

The train dispatcher may authorize a train to leave a main track switch open under the following conditions:

A) The train dispatcher may never authorize a train to leave a main track switch open

B) In non signaled TWC territory when authorized with a track warrant

C) In ABS/TWC territory when authorized with a track warrant

Either B or C

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

23.10 -

What can a dispatcher use to verify the dual control switch(s) to be passed over are LINED for the intended route?

A) OS Block

B) Requested Signal

Switch Block

Both A and B

All of the Above

4.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

23.24 -

During a CTC Code Line failure, trains stopped at a control point displaying a Stop indication may proceed how:

Only after the train dispatcher can establish a restricting signal. The train may then proceed at restricted speed on signal indication to the next control point

Only after receiving joint track and time from the train dispatcher that includes switch “Yes” on the track and time permit

The train must receive verbal authority to pass Stop indication and proceed at restricted speed to the next control point without any further instructions

The train must receive verbal authority from the dispatcher with instructions to hand operate any dual control switches for the intended route

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

23.10 - 9.12.1

What is the correct verbal format to authorize the train past a Stop indication in CTC?

“After inspecting switch (Train ID) at (location) has authority to pass signal displaying Stop indication.” (add: Route and Direction if more than one route is available)

“After stopping, (Train ID) at (location) has authority to pass signal displaying Stop indication.” (add: Route and Direction if more than one route is available)

“After stopping, (Train ID) at (location) has permission to pass signal displaying Stop indication.” (add: Route and Direction if more than one route is available)

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

23.10 - 9.12.1

When the dispatcher cannot provide a proceed indication for a train at locations where dual control switches show to be lined and locked, the dispatcher must:

A) Know that the crew has the signal aspect in view, and apply blocking devices to the dual control switch(s) to be passed over

B) Ensure that any dual control switch(s) is(are) lined for the intended route, and apply blocking devices to the area to be entered

Apply blocking devices to the track segment the train is currently occupying, and set any signals lined into the track segment the train is currently occupying to Stop

Both A and B

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

23.10B - 9.12.1

If the dual control switches do not show to be lined and locked for the intended route, the train dispatcher must also have a clear understanding of which switch(s) to place in Hand operation. A clear understanding must include the following:

Name of employee, route to be taken and direction

Route to be taken, what the employee must do, and an OK time

Route to be taken, what is wrong at that location and what the employee must do

None of the above

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Professional Development