PTRT 1491 Chapter 14 - Power Distribution

PTRT 1491 Chapter 14 - Power Distribution

University

10 Qs

quiz-placeholder

Similar activities

INDUCTION MOTOR

INDUCTION MOTOR

University

15 Qs

Three-phase Uncontrolled Rectifiers (Part 8)

Three-phase Uncontrolled Rectifiers (Part 8)

University

10 Qs

Switchgear

Switchgear

11th Grade - University

15 Qs

E234_W11 (Transformers)

E234_W11 (Transformers)

University

6 Qs

EGII W2W

EGII W2W

University

10 Qs

DEA three phase transformer

DEA three phase transformer

University

10 Qs

Identifying Symbols

Identifying Symbols

University

10 Qs

Induction Motor

Induction Motor

University

10 Qs

PTRT 1491 Chapter 14 - Power Distribution

PTRT 1491 Chapter 14 - Power Distribution

Assessment

Quiz

Other

University

Medium

Created by

John Skopak

Used 56+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. A(n) ____________ ground receptacle minimizes electrical noise by providing a separate grounding path

isolated

GFCI

duplex

standard

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. ______________ is considered normal ambient temperature for transformer installations

20°F

20°C

40°C

40°F

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. A(n) __________ is an assemblage of equipment installed for switching, changing or regulating the voltage of electricity

overload relay

main disconnect

branch circuit

substation

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. A _____________ conductor does not normally carry current, except during a fault

neutral

grounding

hot

switched

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. ______________ are used to step down higher voltage transmitted to the voltage level required by the consumer

Receptacles

Transformers

Semiconductors

Rectifiers

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. _____________ occurs when loads on a transformer are placed so that each coil of the transformer carries the same amount of current

Continuity

Equilibrium

Electrical balance

Grounding fault

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. A(n) _______________ is the portion of a distribution system between the final overcurrent device and the outlet (receptacle) or load connected to it

duplex receptacle

branch circuit

main disconnect

overload relay

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?