Water supply Chapter 3: Pipe, Materials, Fitting, and Supports

Water supply Chapter 3: Pipe, Materials, Fitting, and Supports

Professional Development

23 Qs

quiz-placeholder

Similar activities

AUT108 Fuel Management Systems

AUT108 Fuel Management Systems

Professional Development

20 Qs

HAC101 Week 2 Quiz Heating & Ventilation

HAC101 Week 2 Quiz Heating & Ventilation

Professional Development

20 Qs

Level 3 central heating phase 2

Level 3 central heating phase 2

University - Professional Development

27 Qs

6035 Level 2 Drainage

6035 Level 2 Drainage

Professional Development

20 Qs

WLD-112 Basic Welding (Oxy Fuel Cutting)

WLD-112 Basic Welding (Oxy Fuel Cutting)

11th Grade - Professional Development

20 Qs

Phase 2 Exam prep 2

Phase 2 Exam prep 2

Professional Development

20 Qs

Central Heating Systems

Central Heating Systems

Professional Development

21 Qs

Helpers Training - TN - Final Exam

Helpers Training - TN - Final Exam

Professional Development

20 Qs

Water supply Chapter 3: Pipe, Materials, Fitting, and Supports

Water supply Chapter 3: Pipe, Materials, Fitting, and Supports

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

BuckCityPig BuckCityPig

Used 37+ times

FREE Resource

23 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In 1990, NSF/ANSI 61 was replaced with an advisory program created by the U.S. Environmental Protection Agency.

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An authority having jurisdiction (AHJ) is an organization, office, or individual with legal power to administer, interpret, and enforce codes and standards.

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A specification is a detailed statement of the requirements, such as materials, dimensions, and work quality, for something that is to be built, installed, or manufactured.

False

True

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PVC has a maximum service temperature of 100°F (37.8°C).

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PE pipe/tubing comes in 100' (30.5 m) to 500' (152.4 m) rolls.

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Thermoset plastic can be remelted after it has been shaped and cured.

True

False

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A check valve is specifically required on the discharge piping from water supply tanks at or near the tank and at each water service either at the discharge side of a water service meter or at some point in the unmetered water service.

True

False

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?