1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following building components keeps opposite walls from spreading apart?

Rafters

Ceiling joists

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To transfer roof loads to the foundation, ceiling joists are usually installed _____

directly over wall studs

on a doubled top plate

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When ceiling joists must be overlapped above a loadbearing partition, the overlap must be at least _____.

6"

3"

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The type of roof labeled F is a _____.

gable roof

gambrel roof

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The type of roof labeled B is a _____

mansard roof

hip roof

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The type of roof labeled E is a _____.

gable-and-valley roof

hip-and-valley roof

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Letter E is pointing to a _____.

valley rafter

valley jack rafter

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?