128. Quality and grade are not the same. A fundamental distinction is that:
PMP PROJECT QUALITY MANAGEMENT REV. 2019

Quiz
•
Professional Development
•
Professional Development
•
Hard
Used 1+ times
FREE Resource
Student preview

18 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Quality as a delivered performance or result is the degree to which a set of inherent characteristics fulfills requirements; grade as a design intent is a category assigned to deliverables having the same functional use but different technical characteristics.
A quality level that fails to meet quality requirements may not be a problem; a low grade of quality is always a problem.
Delivering the required levels of quality is not included in the responsibilities of the project manager and the project team.
Delivering the required levels of grade is not included in the responsibilities of the project manager and the project team.
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
129. Understanding, evaluating, defining, and managing requirements are essential to satisfying:
Customer expectations.
The scope statement.
Upper management.
Functional requirements.
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
130. All of the following are primary benefits of meeting quality requirements EXCEPT:
Less rework.
Higher productivity.
Lower costs.
Fewer change orders.
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
131. Inputs to control quality include all of the following EXCEPT:
Project management plan.
Quality metrics.
Work performance data.
PERT chart.
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
133. Manage quality is the process of:
Applying planned, systematic quality activities to ensure effective policing and conformance of the project team to the approved specifications.
Providing the project team and stakeholders with standards by which project performance is measured.
Translating the quality management plan into executable quality activities that incorporate the organization's quality policies into the project.
Assuring the implementation of appropriate specifications, which generally reduces the probability of the project being completed on schedule.
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
134. Cost of quality includes all of the following EXCEPT:
Preventing nonconformance to requirements.
Appraising the product or service for conformance to requirements.
Failing to meet requirements (rework).
Operating computers required for the project.
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
136. Control charts have all of the following characteristics EXCEPT:
They are used to determine whether or not a process is stable or has predictable performance.
They can be used to monitor various types of output variables.
They are used to illustrate how various factors might be linked to potential problems or effects.
They are graphical displays of process data over time and against established control limits, which has a centerline that assists in detecting a trend of plotted values toward either control limit.
Create a free account and access millions of resources
Popular Resources on Quizizz
15 questions
Multiplication Facts

Quiz
•
4th Grade
25 questions
SS Combined Advisory Quiz

Quiz
•
6th - 8th Grade
40 questions
Week 4 Student In Class Practice Set

Quiz
•
9th - 12th Grade
40 questions
SOL: ILE DNA Tech, Gen, Evol 2025

Quiz
•
9th - 12th Grade
20 questions
NC Universities (R2H)

Quiz
•
9th - 12th Grade
15 questions
June Review Quiz

Quiz
•
Professional Development
20 questions
Congruent and Similar Triangles

Quiz
•
8th Grade
25 questions
Triangle Inequalities

Quiz
•
10th - 12th Grade