
Plumbing L2 Hot water PT2
Authored by Nigel Baker
Education
11th - 12th Grade
Used 890+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
25 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What material must not be used on hot water systems?
Push fit plastic
Lead free solder
Lead solder
Soldering lead free fittings
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which British standard covers hot water systems?
BSEN6700
BSEN806
BSEN608
BSEN7600
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is this tool used for?
Checking flow rate of water
Checking the pressure of water
Checking the PH of water
Checking the temperature of the hot water
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What could be used to overcome a dead leg in a hot water system?
Insulation
Secondary return
Inverted loop system
One pipe system
5.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
Where are you required to fit insulation to a hot water pipe?
Within 1m of a cylinder
In a loft space
Under a vented ground floor
All of the above
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What would be the test pressure if the water pressure is 3 bar
5 bar
7.5 bar
10 bar
4.5 bar
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The cold feed to the cylinder should be connected to the?
Top of the cylinder
The bottom of the cylinder
By the use of an Essex flange
A 3rd of the way up the cylinder
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?