Construction Technology

Construction Technology

9th - 12th Grade

35 Qs

quiz-placeholder

Similar activities

MINI TEST UNIT 18 - LEVEL 02 PREPARE

MINI TEST UNIT 18 - LEVEL 02 PREPARE

10th Grade

33 Qs

PTS Genap X TP.2324

PTS Genap X TP.2324

10th Grade

36 Qs

Language revision - punctuations and abbreviations

Language revision - punctuations and abbreviations

9th Grade

30 Qs

untitled

untitled

8th Grade - University

30 Qs

Graphs and Their Equations

Graphs and Their Equations

10th Grade

30 Qs

PTS Ganjil sej.Ind.

PTS Ganjil sej.Ind.

11th Grade

30 Qs

1121 MANDARIN 1 TEST 1

1121 MANDARIN 1 TEST 1

KG - Professional Development

30 Qs

1.1.1. Structure and function of the processor

1.1.1. Structure and function of the processor

12th Grade

34 Qs

Construction Technology

Construction Technology

Assessment

Quiz

9th - 12th Grade

Medium

Created by

Donna Applewhite

Used 36+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

35 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Third Phase

a test for mixed concrete to determine consistency and work ability.

protects the wall behind the counter-top from moisture

process of refining and smoothing the surface of drying concrete

phase of construction where the electricians wire for electricity

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Roughing In

the connecting or joining together of pipes

The installation or first phase of the design process

the knowledge and techniques used to build structures.

moving a straight edge back and forth over a surface

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A drawing that represents a view looking down on an object.

Civil Construction

General Contractor

Subcontractor

Plan View

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Set Back

moving a straight edge back and forth over a surface

protects the wall behind the countertop from moisture

the structural floor joined to the joists; supports the finish flooring.

distance from the front of the house to the street

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Civil Construction

a drawing that represents a view looking down on an object.

person responsible for setting up the schedule to complete the project

structures used by the general public but owned by local, state, or federal government

person hired to complete certain construction tasks

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Plot

measured by their ability to push the electrical current through the system

something put into a system, such as resources, in order to make it work the way it should.

this plan is used to determine where the structure will be placed on the property.

a detailed outline or plan for a building

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The structural floor joined to the joists; supports the finish flooring.

Slump Test

Subfloor

Output

Set Back

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?