1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is dot and dab used to fix:
Floor boards ?
Plaster boards ?
Skirting boards ?
Window boards ?
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where should a Damp Proof Membrane be used:
Between the joists ?
Between the rafters ?
Over a concrete floor ?
Under a concrete floor ?
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of the following defects is caused by continuous moisture and frost on porous bricks:
Cracking ?
Spalling ?
Shrinkage ?
Discolouration ?
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Brick walls require damping down before plaster patching in order to prevent:
efflorescence ?
shrinkage ?
blistering ?
expansion ?
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of the following services is most commonly located by the equipment shown in the image:
Gas ?
Water ?
Sewage ?
Electricity ?
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the safest way to remove waste from scaffolding:
Chute into a skip ?
Bucket on a rope ?
Carry down a ladder ?
Wheelbarrow and ramp ?
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If there are 16 roof tiles per m2, how many tiles are required to cover the roof section shown in the image below:
230 ?
240 ?
250 ?
260 ?
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?