Economic Aspects

Economic Aspects

University

19 Qs

quiz-placeholder

Similar activities

Algebraic Representations

Algebraic Representations

University

15 Qs

Bridge course Test 2

Bridge course Test 2

11th Grade - University

20 Qs

Derivative Quiz

Derivative Quiz

12th Grade - University

19 Qs

C6 : POLYNOMIALS - L3

C6 : POLYNOMIALS - L3

University

20 Qs

mathimatics

mathimatics

1st Grade - University

20 Qs

Polygons

Polygons

2nd Grade - University

16 Qs

Math 1110 -- College Algebra Midterm Review

Math 1110 -- College Algebra Midterm Review

University

15 Qs

Practice Chapter 2 Functions L01

Practice Chapter 2 Functions L01

University

15 Qs

Economic Aspects

Economic Aspects

Assessment

Quiz

Mathematics

University

Practice Problem

Hard

Created by

1NH19EC 003

Used 64+ times

FREE Resource

19 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

In an interconnected system, the diversity factor of the whole system
remains unchanged 
decreases 
increases 
none of the above 

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Load curve is useful in deciding the
operating schedule of generating units
sizes of generating units
total installed capacity of the plant
all of the above

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Load factor of a power station is defined as
maximum demand/average
average load x maximum demand
average load/maximum demand
(average load x maximum demand)

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

High load factor indicates
cost of generation per unit power is increased
total plant capacity is utilised for most of the time
total plant capacity is not properly utilised for most of the time
none of the above

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Power plant having maximum demand more than the installed rated capacity will have utilisation factor
equal to unity
less than unity
more than unity
none of the above

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Maximum demand on a power plant is
the greatest of all "short time interval averaged" demand during the period
instantaneous maximum value of kVA supplied during a period
both (a) or (b)
none of the above

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

is the reserved generating capacity available for service under emergency conditions which is not kept in operation but in working order
Hot reserve
COld reserve
Spinning reserve
Firm power

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?