1.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
In an interconnected system, the diversity factor of the whole system
remains unchanged
decreases
increases
none of the above
2.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
Load curve is useful in deciding the
operating schedule of generating units
sizes of generating units
total installed capacity of the plant
all of the above
3.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
Load factor of a power station is defined as
maximum demand/average
average load x maximum demand
average load/maximum demand
(average load x maximum demand)
4.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
High load factor indicates
cost of generation per unit power is increased
total plant capacity is utilised for most of the time
total plant capacity is not properly utilised for most of the time
none of the above
5.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
Power plant having maximum demand more than the installed rated capacity will have utilisation factor
equal to unity
less than unity
more than unity
none of the above
6.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
Maximum demand on a power plant is
the greatest of all "short time interval averaged" demand during the period
instantaneous maximum value of kVA supplied during a period
both (a) or (b)
none of the above
7.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
is the reserved generating capacity available for service under emergency conditions which is not kept in operation but in working order
Hot reserve
COld reserve
Spinning reserve
Firm power
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?