High Pressure Boilers Chapter 12

High Pressure Boilers Chapter 12

University

25 Qs

quiz-placeholder

Similar activities

Thermal Energy Unit Study Guide

Thermal Energy Unit Study Guide

6th Grade - University

20 Qs

Theories of the Universe Quiz

Theories of the Universe Quiz

6th Grade - University

22 Qs

Male Reproductive System

Male Reproductive System

University

20 Qs

Body Cavities, Directional Terms

Body Cavities, Directional Terms

University

20 Qs

Remed IBM

Remed IBM

University

20 Qs

Energy Conversion

Energy Conversion

7th Grade - University

25 Qs

Turbines Quiz

Turbines Quiz

University

21 Qs

OSH_OSH Management System

OSH_OSH Management System

University

20 Qs

High Pressure Boilers Chapter 12

High Pressure Boilers Chapter 12

Assessment

Quiz

Biology, Science, Specialty

University

Easy

Created by

Night Trees

Used 23+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When taking over a shift, the boiler operator must first check the ___.

steam pressure

fuel oil supply

water level on all boilers

bottom blowdown valves

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The low-water fuel cutoff can be tested by blowing down the low-water fuel cutoff or by ___.

securing the feedwater and allowing the water level in the boiler to drop

closing the blowdown valves

modulating the firing rate

a hydrostatic test

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In order to prevent uneven expansion of the boiler on cold startup, the boiler must be ___.

warmed up as quickly as possible

thoroughly vented

heated using steam from outside sources

warmed up slowly

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During startup, the boiler vent should remain open until a pressure of approximately ___ is reached.

0.1 psi

15 psi

50% of the MAWP

75% of the MAWP

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A safety valve can be manually tested when the ___.

pressure is at least 25% of the MAWP

pressure is at least 75% of the MAWP

burner is going through the firing sequence

boiler is down for inspection

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Boilers equipped with a superheater must be protected during warm-up by ___.

keeping the superheater drain valve closed until the boiler is cut in on-line

keeping the superheater drain valve open until the boiler is cut in on-line

passing the feedwater through the superheater tubes

bypassing the superheater tubes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Superheaters are prevented from overheated by the circulation of ___.

air

steam

water

gases of combustion

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?