Search Header Logo

Ag. Mechanics 1 Unit 4.04-4.05

Authored by David Pack

Life Skills

9th - 12th Grade

Used 59+ times

Ag. Mechanics 1 Unit 4.04-4.05
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

28 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When Sheri is framing a building, sills are installed:

anytime

first

last

sixth

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Because extra strength is needed for support, most framing lumber used for wood buildings should be:

1" thick.

2" thick.

4" thick.

6" thick.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When Jan uses platform-type framing, where is the top plate attached?

above the ceiling joists

below the studs

on top of the rafters

on top of the studs

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When a carpenter frames a building using platform framing, the floor joist header is installed:

anytime.

first.

last.

second.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Trimmer studs for doors are installed:

at the bottom.

at the top.

on each side.

on one side.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the horizontal parts of a building’s framing to which the studs are attached?

foundations

plates

ridges

trusses

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What framing part should a carpenter nail to both the top plate and the sole plate?

ceiling joist

floor joist

rafter

stud

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?