Complex Cold Water Test 6035 Level 3 Plumbing

Complex Cold Water Test 6035 Level 3 Plumbing

Professional Development

45 Qs

quiz-placeholder

Similar activities

TAPP BOOSTER

TAPP BOOSTER

University - Professional Development

40 Qs

YM comparison degrees only HIGH LEVELS

YM comparison degrees only HIGH LEVELS

Professional Development

45 Qs

KTF PT Assesment

KTF PT Assesment

Professional Development

50 Qs

SBI PO DUMIL DUMIL SESSION

SBI PO DUMIL DUMIL SESSION

Professional Development

41 Qs

Sta A1

Sta A1

6th Grade - Professional Development

50 Qs

VSM CA Revision I - Unit 1 to 4

VSM CA Revision I - Unit 1 to 4

Professional Development

40 Qs

माहेश्वरी ज्ञानपति 2020

माहेश्वरी ज्ञानपति 2020

KG - Professional Development

50 Qs

SELASAR W1 SEPT 2024

SELASAR W1 SEPT 2024

Professional Development

50 Qs

Complex Cold Water Test 6035 Level 3 Plumbing

Complex Cold Water Test 6035 Level 3 Plumbing

Assessment

Quiz

Professional Development

Practice Problem

Medium

Created by

Martin Biron

Used 537+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

45 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A commissioning report would include which of the following?

Invoice, address and final comments

Chlorination figures, discharge rates and duration of test pressures

Service plan, comments on job, manufacturer’s instructions

Duration of job, list of test techniques, extra costs incurred

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A notification to the water undertaker should be sent in which of the following situations?

When a fitting is connected to a lead supply

When a material change of use has occurred

When a single check valve has been installed

When an outside tap has been fitted

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The building control officer should be notified at which stage of a job?

After

The beginning

During

Before it begins

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Local Authority should be notified in which of the situations listed below?

When private water supplies are concerned

When a connection is made to an undertakers supply

After commissioning

Before commencing any work relating to a building

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a fitting were found to be defective, what would be the best course of action?

Repair the fitting

Keep the fitting in place and re-route pipework

Replace the fitting

Install a working fitting upstream

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is shown?

Water Softener

Reverse Osmosis Machine

Water Booster Pump

Power Flusher

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A combination bath shower mixer would require which type of protection?

HC

DC

AUK3

DCV

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?