Who is considered the most important person in the construction team?
Unit 210 How to communicate with others in BSE

Quiz
•
Professional Development
•
University
•
Medium
Nigel Baker
Used 634+ times
FREE Resource
21 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Client
Clerk of works
You
Architect
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following is the role of an Architect
They liaise with the client regularly at the early stages, and throughout the project
Ensure the building is constructed as per the drawings, standard of work and quality of materials
They calculate loads, forces, variances from wind and rain, looking at structural safety
They have to position the building on the land, and ensure Building Regulations are followed throughout the process
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following is the role of an Surveyor?
They liaise with the client regularly at the early stages, and throughout the project
Ensure the building is constructed as per the drawings, standard of work and quality of materials
They calculate loads, forces, variances from wind and rain, looking at structural safety
They have to position the building on the land, and ensure Building Regulations are followed throughout the process
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following is the role of an Structural engineer?
They liaise with the client regularly at the early stages, and throughout the project
Ensure the building is constructed as per the drawings, standard of work and quality of materials
They calculate loads, forces, variances from wind and rain, looking at structural safety
They have to position the building on the land, and ensure Building Regulations are followed throughout the process
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following is the role of an Clerk of works?
They liaise with the client regularly at the early stages, and throughout the project
Ensure the building is constructed as per the drawings, standard of work and quality of materials
They calculate loads, forces, variances from wind and rain, looking at structural safety
They have to position the building on the land, and ensure Building Regulations are followed throughout the process
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following regulation relate to plumbing?
Water regulations
Building regulations
Gas regulations
all of the above
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Building regulation part L relates to?
Electrical safety
Combustion appliances and fuel storage systems
Sanitation, hot water safety and water efficiency
Conservation of fuel and power
Create a free account and access millions of resources
Similar Resources on Quizizz
21 questions
CERT: Unit 1 Review

Quiz
•
10th Grade - University
20 questions
MARLAW: WK13 Q1

Quiz
•
University
16 questions
ACR-105 unit 15 test

Quiz
•
University
24 questions
Electrical installation 2365

Quiz
•
KG - University
20 questions
Maori Overview

Quiz
•
University
20 questions
IQ Quiz

Quiz
•
10th Grade - University
20 questions
PART 2: PRODUCT SAFETY & DEFENSE IN WAREHOUSING & DISTRIBUTION

Quiz
•
3rd Grade - University
22 questions
Week 2 Quiz: Scientific Management Theory

Quiz
•
University
Popular Resources on Quizizz
15 questions
Character Analysis

Quiz
•
4th Grade
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
10 questions
American Flag

Quiz
•
1st - 2nd Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
18 questions
Full S.T.E.A.M. Ahead Summer Academy Pre-Test 24-25

Quiz
•
5th Grade
14 questions
Misplaced and Dangling Modifiers

Quiz
•
6th - 8th Grade