Who is considered the most important person in the construction team?
Client
Clerk of works
You
Architect
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following is the role of an Architect
They liaise with the client regularly at the early stages, and throughout the project
Ensure the building is constructed as per the drawings, standard of work and quality of materials
They calculate loads, forces, variances from wind and rain, looking at structural safety
They have to position the building on the land, and ensure Building Regulations are followed throughout the process
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following is the role of an Surveyor?
They liaise with the client regularly at the early stages, and throughout the project
Ensure the building is constructed as per the drawings, standard of work and quality of materials
They calculate loads, forces, variances from wind and rain, looking at structural safety
They have to position the building on the land, and ensure Building Regulations are followed throughout the process
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following is the role of an Structural engineer?
They liaise with the client regularly at the early stages, and throughout the project
Ensure the building is constructed as per the drawings, standard of work and quality of materials
They calculate loads, forces, variances from wind and rain, looking at structural safety
They have to position the building on the land, and ensure Building Regulations are followed throughout the process
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following is the role of an Clerk of works?
They liaise with the client regularly at the early stages, and throughout the project
Ensure the building is constructed as per the drawings, standard of work and quality of materials
They calculate loads, forces, variances from wind and rain, looking at structural safety
They have to position the building on the land, and ensure Building Regulations are followed throughout the process
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following regulation relate to plumbing?
Water regulations
Building regulations
Gas regulations
all of the above
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Building regulation part L relates to?
Electrical safety
Combustion appliances and fuel storage systems
Sanitation, hot water safety and water efficiency
Conservation of fuel and power
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?