Search Header Logo

ID1 4.01-4.02 Interior Design Process

Authored by Kristi Ward

Life Skills

9th - 12th Grade

Used 35+ times

ID1 4.01-4.02 Interior Design Process
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

21 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Mark created quick sketches from the information the client has given him, to help envision the project. What part of the design process involves drawings?

contract documents

design development

programming

SCHEMATIC design

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A designer is monitoring work to be completed by an electrician, a plumber, and a cabinet installer for the Shulers' kitchen. Which stage of the design process is the CONTRACTED work being done?

CONTRACT administration

design development

programming

schematic design

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Tricia liked the interior designer's portfolio of past projects and decided to hire him. This happens BEFORE design actually begins:

contract documents

design development

PRE-design

schematic design

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During which phase of the design process does a designer narrow design concepts from the schematic phase for the client's review and approval?

contract documents

DESIGN DEVELOPMENT

pre design

programming

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The design team discussed the project goals, costs, and deadlines. Which term describes an overview all of these things?

fesability

insight

logistics

SCOPE

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The designer revised and is DEVELOPING the drawings and is waiting for the client's approval of solutions. Which phase of the design process is she in?

contract document

design DEVELOPMENT

programming

schematic design

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The kitchen and bath designer had to coordinate the cabinetmaker, cabinet installer, countertop installer, and the tile installer to make sure the job was completed perfectly and on time. Which term describes coordinating a complex operation?

feasibility

insight

LOGISTICS

scope

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?