DEMOLITION & RENOVATION

DEMOLITION & RENOVATION

University

20 Qs

quiz-placeholder

Similar activities

Cost Estimating Theory

Cost Estimating Theory

12th Grade - University

16 Qs

Renaissance,Baroque and the Transitional Period

Renaissance,Baroque and the Transitional Period

University

15 Qs

RA 9514 - Fire Code of the Philippines

RA 9514 - Fire Code of the Philippines

University

21 Qs

CONSTRUCTION PRE-PLANNING QUIZ

CONSTRUCTION PRE-PLANNING QUIZ

University

20 Qs

Planning 3 (CTTO)

Planning 3 (CTTO)

University

15 Qs

BUILDING UTILITES 2 FINAL EXAM

BUILDING UTILITES 2 FINAL EXAM

University

20 Qs

Laws Affecting Architecture in PH - 01

Laws Affecting Architecture in PH - 01

7th Grade - Professional Development

16 Qs

Greek & Roman Architecture

Greek & Roman Architecture

KG - Professional Development

20 Qs

DEMOLITION & RENOVATION

DEMOLITION & RENOVATION

Assessment

Quiz

Architecture

University

Practice Problem

Medium

Created by

Anna Farhana

Used 13+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Define Demolition

Process of taking off any existing structures and non-structures

Process of taking off any existing structures only

Process of taking off building material

Process of removing all tress and green

2.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Types of demolition

bridge

Structures

non-structures

brickwork

3.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

All are the reasons why demolition is conducted, except

To construct a new building

The existing building is not sufficient to accommodate current occupants

Old and damage building

The existing building is being ordered from the consultant to conduct a demolition works

4.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Media Image

Which type of demolition is suitable for the above picture?

General & site clearance

Building

Structure

Scrap material

5.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Media Image

Which types of demolition is suitable for the above picture?

General and site clearance

Building

Structure

Scrap material

6.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

All of the below is the example of structure demolition, except?

Bridge

Tunnel

Railway

School

7.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

This type of demolition usually being found as unused construction material on the site for example reinforcement bar, steel pipe & brc etc. This demolition material fall under which category?

General & site clearance

Building

Structure

Scrap material

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?