GIT 2

GIT 2

Assessment

Assessment

Created by

Mohana Sundaram M

Science, Architecture, Design

University

9 plays

Medium

Student preview

quiz-placeholder

10 questions

Show all answers

1.

MULTIPLE CHOICE

30 sec • 1 pt

Media Image

This is a example of

2.

MULTIPLE CHOICE

45 sec • 1 pt

If field situations warrant to avoid open-cut work or non-availability of adequate submergence, the ground water can be lowered by means of ______________drainage system.

3.

MULTIPLE CHOICE

30 sec • 1 pt

A complete drain consists of three components

4.

MULTIPLE CHOICE

30 sec • 1 pt

GPM Stands for

5.

MULTIPLE CHOICE

30 sec • 1 pt

Types of installing perloading

6.

MULTIPLE CHOICE

30 sec • 1 pt

Prefabricated vertical drains also called as

7.

MULTIPLE CHOICE

30 sec • 1 pt

In reinforced earth wall how many type of stability are checked

8.

MULTIPLE CHOICE

30 sec • 1 pt

_____________ is a polymeric products

9.

MULTIPLE CHOICE

30 sec • 1 pt

Media Image

This is a example of

10.

MULTIPLE CHOICE

30 sec • 1 pt

Media Image

This is a example of

Explore all questions with a free account

or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?